(or Milestones) due to delay beyond the control of <br /> CONTRACTOR, the Contract Times (or Milestones) will r _ whom nrxremn is res.,..nsibl <br /> be extended in an amount equal to the time lost due to such <br /> delay if a Claim is made therefor as provided in paragraph <br /> 12 .02.A. Delays beyond the control of CONTRACTOR ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> shall include, but not be limited to, acts or neglect by CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> OWNER, acts or neglect of utility owners or other DEFECTIVE WORK <br /> contractors performing other work as contemplated by <br /> Article 7, fires, floods, epidemics, abnormal weather <br /> conditions, or acts of God. 13 .01 Notice of Defects <br /> 12.04 Delays Within CONTRACTOR 's Control A. Prompt notice of all defective Work of which <br /> OWNER or ENGINEER has actual knowledge will be <br /> A. The Contract Times (or Milestones) will not be given to CONTRACTOR. All defective Work may be <br /> extended due to delays within the control of rejected, corrected, or accepted as provided in this <br /> CONTRACTOR. Delays attributable to and within the Article 13 . <br /> control of a Subcontractor or Supplier shall be deemed to be <br /> delays within the control of CONTRACTOR. 13 .02 Access to Work <br /> 12.05 Delays Beyond OWNER 's and CONTRACTOR 's A. OWNER, ENGINEER, ENGINEER's Con- <br /> Control sultants, other representatives and personnel of OWNER, <br /> independent testing laboratories, and governmental agencies <br /> A. Where CONTRACTOR is prevented from with jurisdictional interests will have access to the Site and <br /> completing any part of the Work within the Contract Times the Work at reasonable times for their observation, <br /> (or Milestones) due to delay beyond the control of both inspecting, and testing. CONTRACTOR shall provide <br /> OWNER and CONTRACTOR, an extension of the them proper and safe conditions for such access and advise <br /> Contract Times (or Milestones) in an amount equal to the them of CONTRACTOR's Site safety procedures and <br /> time lost due to such delay shall be CONTRACTOR's sole programs so that they may comply therewith as applicable. <br /> and exclusive remedy for such delay. <br /> 13 .03 Tests and Inspections <br /> 12 .06 Delay Damages <br /> A. CONTRACTOR shall give ENGINEER timely <br /> Paragraphs 12.06.A and 12.06 B have been deleted and notice of readiness of the Work for all required inspections, <br /> replaced with a new paragraph. See the Supplementary tests, or approvals and shall cooperate with inspection and <br /> Conditions. testing personnel to facilitate required inspections or tests. <br /> Ain 1. lln 4lE of LTTf'PMER� <br /> ] 'able <br /> A Cn CTQR _ c h_ _ Fade_ any Supplier, Paragraph 13.03.B has been deleted and replaced with a <br /> new paragraph. See the Supplementary Conditions. <br /> employee r agefA of any of: theffi; for dafnages arising o W OWNER shall r <br /> igy and pay fef the sev ices of <br /> eTBr-LCsaltingrenx an independent testing laboratefy to pet4bFm-a44Fkpeefieas, <br /> " <br /> delays ..ed L..J ... _ ..dth:., the eontml of e�mY.i <br /> "^ " <br /> SCI <br /> fevals <br /> 2 delays 1, Jd h eantrol e f: both , <br /> n TyE d CO AC-T elud:..g hoot not <br /> lifnited ta fires, floods, abnormaleether hincurred .:th <br /> $ond ' ' f God,epidemics,aets or .de t by tilit.04A.MPFq OF .. ..d.. ..t ted p t..�p <br /> the_ con-Tactors ..e..{;.....:.. .. ..the_ . ,._l. n 13 shall h paid as provided in said paragraph <br /> D Nothing in this paragraph 12 .06 baFs a change Zh ,.dicall.J. provided in the <br /> CONTRACTOR d delay, e_!e_ence o fA:� <br /> 00700 - 36 <br />