My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is ENGINEER's responsibility to observe the c. OWNER has been required to correct <br /> Work. defective Work or complete Work in accordance <br /> with paragraph 13 .09 ; or <br /> 3 . By recommending any such payment <br /> ENGINEER will Dot thereby be deemed to have d. ENGINEER has actual knowledge of the <br /> represented that: (i) inspections made to check the occurrence of any of the events enumerated in <br /> quality or the quantity of the Work as it has been paragraph 15 .02 .A. <br /> performed have been exhaustive, extended to every <br /> aspect of the Work in progress, or involved detailed New paragraphs 14.02.B.5.e and f have been added. <br /> inspections of the Work beyond the responsibilities See the Supplementary Conditions. <br /> specifically assigned to ENGINEER in the Contract <br /> Documents; or (ii) that there may not be other C. Payment Becomes Due <br /> matters or issues between the parties that might <br /> entitle CONTRACTOR to be paid additionally by 1 days a " presentation of <br /> OWNER or entitle OWNER to withhold payment to <br /> CONTRACTOR. "" " <br /> mended will'(subject pirovisions ofpaFagFaph <br /> 4. Neither ENGINEER's review of 1 " 02 ) become dueand 'Ahen &e ""ll be paid by <br /> CONTRACTOR's Work for the purposes of recom- D` "'1414•o CONTRA" TTOR <br /> mending payments nor ENGINEER's recommenda- <br /> tion of any payment, including final payment, will D. Reduction in Payment <br /> impose responsibility on ENGINEER to supervise, <br /> direct, or control the Work or for the means, meth- 1 . OWNER may refuse to make payment of <br /> ods, techniques, sequences, or procedures of the full amount recommended by ENGINEER <br /> construction, or the safety precautions and programs because: <br /> incident thereto, or for CONTRACTOR's failure to <br /> comply with Laws and Regulations applicable to a. claims have been made against OWNER <br /> CONTRACTOR's performance of the Work. on account of CONTRACTOR's performance or <br /> Additionally, said review or recommendation will furnishing of the Work; <br /> not impose responsibility on ENGINEER to make <br /> any examination to ascertain how or for what Part of Paragraph 14.02.D.1 .2 .b. has been deleted. <br /> purposes CONTRACTOR has used the moneys paid b. Liens have been filed in connection with <br /> on account of the Contract Price, or to determine the Work, .h=-e r-nwrrv_errnn hs <br /> that title to any of the Work, materials, or equipment delivered Y .a d satisfactory OWN <br /> has passed to OWNER free and clear of any Liens. P4 is seei-up, the gatisfaetion, and this"`" ge of <br /> such-I=ierts; <br /> 5 . ENGINEER may refuse to recornmend <br /> the whole or any part of any payment if, in c. there are other items entitling OWNER to <br /> ENGINEER's opinion, it would be incorrect to a set-off against the amount recommended; or <br /> make the representations to OWNER referred to in <br /> paragraph 14.02.B.2. ENGINEER may also refuse d. OWNER has actual knowledge of the <br /> to recommend any such payment or, because of occurrence of any of the events enumerated in <br /> subsequently discovered evidence or the results of paragraphs 14.02 .B. 5.a through 14.02.B .5 .c or <br /> subsequent inspections or tests, revise or revoke any paragraph 15 .02 .A. <br /> such payment recommendation previously made, to <br /> such extent as may be necessary in ENGINEER's New paragraphs 14.02.D.1 .e, f, and g have been added. <br /> opinion to protect OWNER from loss because: See the Supplementary Conditions. <br /> a. the Work is defective, or completed 2. If OWNER refuses to make payment of <br /> Work has been damaged, requiring correction or the full amount recommended by ENGINEER, <br /> replacement; OWNER must give CONTRACTOR immediate <br /> written notice (with a copy to ENGINEER) stating <br /> b. the Contract Price has been reduced by the reasons for such action and promptly pay CON- <br /> Written Amendment or Change Orders; TRACTOR any amount remaining after deduction <br /> of the amount so withheld. OWNER shall promptly <br /> 00700 - 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.