My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 = SUPPLEMENTARY CONDITIONS TO THE <br /> GENERAL CONDITIONS <br /> SC-1 .00 Introduction <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract ( No . 1910-8 , 1996 Edition ) and other provisions of the Contract <br /> Documents as indicated below. All provisions , which are not so amended or supplemented , <br /> remain in full force and effect. <br /> The terms used in these Supplementary Conditions will have the meanings indicated in the <br /> General Conditions. <br /> SC-1 .01 Defined Terms <br /> SC- 1 . 01 .A. 20. Add the following language at the end of GC- 1 . 01 .A . 20: <br /> ENGINEER: Name IRC Engineering Division <br /> Address 1840 25'" Street <br /> City, State , Zip Vero Beach , FL 32960 <br /> Phone 772-567-8000 x 1280 <br /> Fax 772-778-9391 <br /> SC -2 .05 Before Starting Construction <br /> SC-2 . 05 . C. Delete paragraph GC 2. 05. 0 in its entirety and insert the following paragraph in its <br /> place: <br /> C . Evidence of Insurance: CONTRACTOR shall not commence work under this <br /> Contract until he has obtained all insurance required under Article 5 and such <br /> insurance has been delivered to the OWNER and approved by the OWNER , nor <br /> shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13. <br /> SC-2 .06 Pre-Construction Conference <br /> SC-2. 06 Delete paragraph GC-2. 06.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Engineer will call a pre-construction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the work and to discuss schedules referred to in paragraph 2.05 . 6 , procedures <br /> for handling Shop Drawings and other submittals, and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work. <br /> 0201 -00800 - Supplementary Conditions <br /> 00800 1 <br /> F1Engineering\Captal Projects10201 -03124-Indian R.ver Drive Sidewalk-South-Highland Drive SM0201 Indian River Drive South Sidewalk - Conlracl Docs10201 -00800 - <br /> Suppementary Conditions.doc Rev. 0501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.