My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:08:00 PM
Creation date
9/30/2015 10:28:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012
Agenda Item Number
11.I.2
Entity Name
L.H.Tanner Construction
Subject
Indian River Drive South Sidewalk Improvements
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6065
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SECTION 00948 - Work Change Directive <br /> No . <br /> EFFECTIVE DATE : <br /> r DATE OF ISSUANCE : <br /> OWNER : Indian River County <br /> CONTRACTOR: <br /> Contract: <br /> Project: <br /> OWNER's Contract No . ENGINEER's Contract No . <br /> ENGINEER : <br /> i <br /> You are directed to proceed promptly with the following changes: <br /> Description : <br /> Purpose of Work Change Directive: <br /> r <br /> Attachments : (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> r Contract Prices : Contract Times <br /> Unit Prices ❑ Contractor's Records <br /> Lump Sum ❑ Engineer's Records <br /> r ❑ Other:_ ❑ Other:_ <br /> Q By Change Order: ❑ By Change Order: <br /> Estimated increase (decrease) in Contract Price : Estimated increase (decrease) in Contract Times : <br /> $ Substantial Completion : days; <br /> Ready for Final Completion : _ days . <br /> If the change involves an increase , the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization . authorization . <br /> RECOMMENDED : AUTHORIZED : <br /> r By: By: <br /> ENGINEER (Authorized Signature) OWNER (Authorized Signature) <br /> r Date: Date: <br /> END OF SECTION <br /> 0201 -00948 - Work Change Directive <br /> 00948 - 1 <br />_ F 1EngineeringZateral Projects10201 -03128-Indian River Drive Sidewalk-South-highland Drive SW10201 Indian River Drive South Sidewalk - Contract Docs1D201 -00948 - <br /> Work Change Directive.doc Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.