Laserfiche WebLink
a <br /> a 0201 -01340 - Submittal of Shop Drawings <br /> 1 . 5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> a DRAWINGS , PRODUCT DATA AND SAMPLES <br /> A . The CONTRACTOR' s responsibilities for submittal of shop drawings , <br /> a product data , and samples are set forth in paragraph 6 . 17 of the General <br /> Conditions and as further explained herein . <br />+ B . Prior to submission , thoroughly check shop drawings , product data , and <br /> samples for completeness and for compliance with the Contract <br /> a Documents , verify all dimensions and field conditions , and coordinate the <br /> shop drawings with the requirements for other related work . Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br />,. that it is acceptable in terms of the means , methods , techniques , <br /> sequences and operations of construction , safety precautions and <br /> programs incidental thereto , all of which are the CONTRACTOR's <br /> a responsibility . <br /> 1 . It is CONTRACTOR' S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> a ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> a for ENGINEER to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision <br /> a without review. <br /> C . The CONTRACTOR's responsibility for errors and omissions in submittals <br /> a is not relieved by the ENGINEER's review of submittals . The <br /> CONTRACTOR shall approve the shop drawings based on his in-the-field <br /> measurements , prior to submittal to the ENGINEER for his review. <br /> D . Notify the ENGINEER, in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents . The <br /> a CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER's review of submittals , unless the ENGINEER gives written <br /> acceptance of specific deviations . <br /> E . Begin no work , which requires submittals until return of submittals with the <br /> ENGINEER's stamp and initials or signature indicating the submittal has <br /> been reviewed . <br /> a 0201 -01340 - Submittal of Shop Drawings <br /> 01340-2 <br /> F:\Engineering\Capital Projects\0201 -03128-Indian River Drive Sidewalk-South-Highland Drive SW\0201 Indian River Drive South <br /> Sidewalk - Contract Docs\0201 -01340 - Submittal of Shop Drawings.doc <br /> a <br />