i <br /> b . Manufacturer's literature with product description , performance and <br /> test data , and reference standards . <br /> c. Samples , if appropriate . <br /> d . Name and address of similar projects on which proouct was used , <br /> i and date of installation . <br /> 2 . For construction methods ( if specified ) : <br /> a . Detailed description of proposed method . <br /> b . Drawings illustrating method . <br /> 3 . Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product, manufacturer or method <br /> specified . <br /> i C . In making Request for Substitution , CONTRACTOR represents that: <br /> 1 . CONTRACTOR has investigated proposed substitution , and deter- <br /> mined that it is equal to or superior in all respects to the product, <br /> manufacturer or method specified . <br /> 2 . CONTRACTOR will provide the same or better guarantees or <br /> warranties for proposed substitution as for product , manufacturer, or <br /> ,. method specified . <br /> 3 . CONTRACTOR waives all claims for additional costs or extension of <br /> time related to a proposed substitution that subsequently may become <br /> i apparent. <br /> D . A proposed substitution will not be accepted if: <br /> i 1 . Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents . <br /> 2 . It will delay completion of the Work , or the work of other contractors . <br /> i 3 . It is indicated or implied on a Shop Drawing and is not accompanied by <br /> a formal Request for Substitution from CONTRACTOR. <br /> i E . If the ENGINEER determines that a proposed substitute is not equal to that <br /> specified , furnish the product, manufacturer, or method specified at no additional <br /> cost to OWNER. <br /> F . Approval of a substitution will not relieve CONTRACTOR from the requirement <br /> for submission of Shop Drawings as set forth in the Contract Documents . <br /> i <br /> G . The procedure for review by Engineer will include the following : <br /> 1 . Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR. <br /> 2 . Upon receipt of an application for review of a substitution , Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item . <br /> i 01630-2 01630 Substitutions <br /> F%EngineeringlCapital Projects\0201 -03128-Indian River Drive Sidewalk-South-Highland Drive SW\0201 Indian River Drive South <br /> Sidewalk - Contract Docs\0201 -01630 - Substitutions.doc <br /> i <br />