Laserfiche WebLink
• PART 3 - EXECUTION <br /> A . Design , construct, and maintain the pollution control and treatment system to <br /> minimize erosion and capture and remove pollutants from the construction site <br /> r and from all other areas disturbed by construction activities . <br /> Item of Payment <br /> r <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 3 - Erosion and Water Pollution - Lump Sum <br /> (The rest of this page intentionally left blank) <br /> i <br /> r <br /> r <br /> r <br /> i <br /> r <br />+� Last revised 7/9/01 01025- 10 Technical Specifications <br /> F:\Engineering\Capital Projects\0201-03128-Indian River Drive Sidewalk-South-Highland Drive SVJ\0201 Indian River Drive South <br /> Sidewalk - Contract Docs\0201 - Technical Specifcations.doc <br /> r <br />