My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-012A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 12:10:01 PM
Creation date
9/30/2015 10:29:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/09/2007
Control Number
2007-012A
Agenda Item Number
11.1.2
Entity Name
L.H. Tanner
Subject
Contract/Specifications Indian River Drive South Sidewalks
Area
Indian River Drive
Project Number
0201
Bid Number
2007027
Supplemental fields
SmeadsoftID
6066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approval-Major and Minor Construction Changes, Form No. 700-010-47. <br /> 23. TIME EXTENSIONS . <br /> The City may grant an extension of Contract Time when it add s new work items or provides for <br /> unforeseen work, provided that the additional work actually impacts the contract critical path completion <br /> schedule. The City may also grant an extension of Contract Time when a critical path item of work is delayed • <br /> by factors not reasonably anticipated or foreseeable at the time of bid or if failure of the City to fulfill an <br /> obligation under the contract results in delays to the schedule critical path . The City may consider the delays <br /> in delivery of materials or equipment that affect progress on a critical item of work as the basis for granting a <br /> time extension if such delays are beyond the control of the Contractor. Requests for time extensions due to <br /> delay in the delivery of custom manufactured equipment or fixtures will not be considered unless the <br /> contractor furnishes documentation that the order was placed in a timely manner and the lack of such <br /> equipment cased a delay in progress on a critical item . <br /> Extensions of Contract Time will not be granted for delays due to the fault or negligence of the <br /> Contractor. <br /> No allowance for inclement weather should be made in establishing the Contract Time . The City may <br /> grant time extensions on a day for day basis for delays caused only by inclement weather conditions that <br /> prevent the contractor from productively performing critical path items where: (i) the contractor is unable to ab <br /> work at least 50% of the day on a pre-determined critical path item due to the weather; or (ii) the contractor <br /> must make major repairs to work damaged by weather provided that the damage is not due to the contractor's <br /> failure to perform and that the contractor is unable to work at least 50% of the day on pre-determined critical <br /> path items. No <br /> 24. LIQUIDATED DAMAGES <br /> Applicable liquidated damages will be assessed in the following amount: $ 1 ,423 .00 per day IN <br /> 25. CONTRACT CLAIMS BY CONTRACTOR <br /> • <br /> Should the contractor intend to file a claim for additional monetary compensation , time or other <br /> adjustments to the contract and the City disputes the contractor's entitlement to the claim or the impact of the <br /> claim , Contractor must provide written notification to the City of contractor's intent to file a claim . This notice <br /> must be given before the contractor begins anywork on which the claim is based . Failure of the contractor to <br /> notify the City before beginning work on any disputed items waives the contractor's right to claim . The <br /> contractor's notice of intent to file a claim should contain : <br /> r <br /> (1 ) A statement as to what changed, including a description of the nature and extent of the <br /> change. <br /> (2) An indication of who directed or what caused the change . <br /> (3) A description of how the change has or will impact the contractor, including reference to any <br /> impacted critical activities on the contractor's latest accepted schedule update. ■ <br /> (4) A statement of damages, or an estimate of damages if available, detailing the amount of <br /> compensation , time and/or other adjustment to the contract that is being requested . <br /> ■ <br /> 26. DRUG -FREE WORKPLACE CERTIFICATION <br /> In accordance with Florida Statute 287 .087 , the bidder shall certify that it has and will maintain a drug-free ■ <br /> workplace. The bidder shall complete and submit with its bid proposal the attached certification . Failure to <br /> include an executed certification may cause the bid proposal to be considered non-responsive. <br /> ■ <br /> 23 <br /> ar,M 95429 AM <br /> ■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.