Laserfiche WebLink
Florida Erosion and Sediment Control Inspector's Manual <br /> r <br /> 1 . Set Stakes 2. Excavate a 4" X 4" Trench <br /> Upslope Along the Line of Stakes <br /> r <br /> Max <br /> IUI <br /> soFlow <br /> Ill 111 � ' va <br /> 4' <br /> 3. Staple Filter Material to Stakes 4. Backfill and Compact the <br /> and Extend it into the Trench Excavated Soil <br /> �~ VIII Jill ` <br /> Gam✓ �r G=<� <br /> Flow <br /> III " '• - III � ,.. <br /> Sheet Flow Installation r <br /> (Perspective View) _ <br /> r <br /> I I <br /> I I <br /> A I FB I s rn A <br /> Flow 1 <br /> Points A Should be Higher than Point 8 - r <br /> Drainageway Installation <br /> (Front Elevation) <br /> r <br /> Plate 4.06b Construction of a Filter Barrier <br /> Source: NRCS <br /> r <br /> 4-24 <br /> • <br />