Laserfiche WebLink
Florida Erosion and Sediment Control Inspector's Manual <br /> CHAPTER 4 <br /> BEST MANAGEMENT PRACTICES <br /> FOR EROSION AND SEDIMENTATION CONTROL <br /> _ 4 . 01 IMPORTANCE OF CONSTRUCTION SEQUENCING 1 <br /> 4 .02 POLLUTION SOURCE CONTROLS ON CONSTRUCTION SITES 3 <br /> 4. 03 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 7 <br /> 4 . 04 CONSTRUCTION ROAD STABILIZATION 11 <br /> 4.05 STRAW BALE BARRIER 13 <br /> i 4. 06 SILT FENCE 21 <br /> 4. 07 BRUSH BARRIER 31 <br /> i <br /> 4 .08 STORMDRAIN INLET PROTECTION 33 <br /> 4. 15 TEMPORARY DIVERSION DIKE 55 <br /> 4 . 16 TEMPORARY FILL DIVERSION 59 <br /> s <br /> 4 . 17 TEMPORARY RIGHT-OF-WAY DIVERSION 63 <br />++ 4 . 25 TEMPORARY SEDIMENT TRAP 67 <br /> 4 .26 TEMPORARY SEDIMENT BASIN 79 <br /> 4 . 30 TEMPORARY SLOPE DRAIN 99 <br />.. 4 . 38 TEMPORARY CHECK DAMS 105 <br /> 4 .40 DEWATERING 113 <br /> 4 .45 FLOATING TURBIDITY BARRIER 115 <br /> CHAPTER NOTE <br /> Effective control of erosion and sedimentation depends on the proper use of a number of <br /> specific best management practices (BMP's) . Each of these has a correct application , <br /> installation , and maintenance requirement. This chapter provides a "toolbox" of BMP's with <br /> instructions for their use . Always remember that the rules are performance based . <br /> Implementation according to this manual is no guarantee of success , nor is it a constraint <br /> to prevent the use of other more efficient or cost effective measures. <br />