Laserfiche WebLink
r <br /> Florida Erosion and Sediment Control Inspector's Manual <br /> rt� r <br /> LEVEL PORTION L CREST AND CONTROL- SECTION <br /> r <br /> -_—�► FLOW �` r <br /> r <br /> APPROACH C <br /> CHANNEL BERM EXIT SECTOR <br /> 1 _ <br /> NOTE NEITHER THE LOCATION <br /> NOR ALIGNMENT OF THE <br /> IP CONTROL SECTION HAS <br /> TO COINCIDE WITH THE r <br /> CENTERUNE OF THE DAM. <br /> EMBANKMENT <br /> rt r <br /> L <br /> Plan View r <br /> r <br /> WATER SURFACE X- LENCTH OF <br /> EXIT CHANNEL <br /> STAGE (HP) CONTROL SECTION <br /> lH1N- 20' EXIT SECTOR <br /> r <br /> LEVEL OR <br /> GREATER <br /> APPRQACH <br /> CHANNEL S <br /> • <br /> Profile Along Centerline 2 IDO' <br /> 1 � - <br /> d <br /> r <br /> b <br /> Cross-Section at Control Section <br /> Plate 4.26j Excavated Earth Spillway r <br /> Source: NRCS <br /> r <br /> 4-94 <br /> r <br />