Laserfiche WebLink
8 .05 Lands and Easements, Reports and Tests responsibility in respect thereof will be as set forth in the <br /> Supplementary Conditions. <br /> A. OWNER's duties in respect of providing lands and <br /> easements and providing engineering surveys to establish <br /> reference points are set forth in paragraphs 4.01 and 4.05. ARTICLE 9 - ENGINEER' S STATUS DURING <br /> Paragraph 4.02 refers to OWNER's identifying and making CONSTRUCTION <br /> available to CONTRACTOR copies of reports of explora- <br /> tions and tests of subsurface conditions and drawings of <br /> physical conditions in or relating to existing surface or 9 . 01 OWNER 'S Representative <br /> subsurface structures at or contiguous to the Site that have <br /> been utilized by ENGINEER in preparing the Contract A. ENGINEER will be OWNER's representative <br /> Documents. during the construction period. The duties and responsi- <br /> bilities and the limitations of authority of ENGINEER as <br /> 8 .06 Insurance OWNER's representative during construction are set forth <br /> in the Contract Documents and will not be changed without <br /> A. OWNER's responsibilities, if any, in respect to written consent of OWNER and ENGINEER. <br /> purchasing and maintaining liability and property insurance <br /> are set forth in Article 5 . 9.02 Visits to Site <br /> 8.07 Change Orders A. ENGINEER will make visits to the Site at inter- <br /> vals appropriate to the various stages of construction as <br /> A. OWNER is obligated to execute Change Orders as ENGINEER deems necessary in order to observe as an <br /> indicated in paragraph 10.03, experienced and qualified design professional the progress <br /> that has been made and the quality of the various aspects of <br /> 8 .08 Inspections, Tests, and Approvals CONTRACTOR's executed Work. Based on information <br /> obtained during such visits and observations, ENGINEER, <br /> A. OWNER's responsibility in respect to certain for the benefit of OWNER, will determine, in general, if the <br /> inspections, tests, and approvals is set forth in paragraph Work is proceeding in accordance with the Contract <br /> 13 .03 .B. Documents. ENGINEER will not be required to make <br /> exhaustive or continuous inspections on the Site to check <br /> 8.09 Limitations on OWNER 's Responsibilities the quality or quantity of the Work. ENGINEER's efforts <br /> will be directed toward providing for OWNER a greater <br /> A. The OWNER shall not supervise, direct, or have degree of confidence that the completed Work will conform <br /> control or authority over, nor be responsible for, generally to the Contract Documents. On the basis of such <br /> CONTRACTOR's means, methods, techniques, sequences, visits and observations, ENGINEER will keep OWNER <br /> or procedures of construction, or the safety precautions and informed of the progress of the Work and will endeavor to <br /> programs incident thereto, or for any failure of CON- guard OWNER against defective Work. <br /> TRACTOR to comply with Laws and Regulations applica- <br /> ble to the performance of the Work. OWNER will not be B. ENGINEER's visits and observations are subject <br /> responsible for CONTRACTOR's failure to perform the to all the limitations on ENGINEER's authority and <br /> Work in accordance with the Contract Documents. responsibility set forth in paragraph 9. 10, and particularly, <br /> but without limitation, during or as a result of ENGINEER's <br /> 8. 10 Undisclosed Hazardous Environmental visits or observations of CONTRACTOR's Work <br /> Condition ENGINEER will not supervise, direct, control, or have <br /> authority over or be responsible for CONTRACTOR's <br /> A. OWNER's responsibility in respect to an undis- means, methods, techniques, sequences, or procedures of <br /> closed Hazardous Environmental Condition is set forth in construction, or the safety precautions and programs <br /> paragraph 4.06. incident thereto, or for any failure of CONTRACTOR to <br /> comply with Laws and Regulations applicable to the <br /> 8 . 11 Evidence of Financial Arrangements performance of the Work. <br /> A. If and to the extent OWNER has agreed to famish 9.03 Project Representative <br /> CONTRACTOR reasonable evidence that financial <br /> arrangements have been made to satisfy OWNER's A. If OWNER and ENGINEER agree, ENGINEER <br /> obligations under the Contract Documents, OWNER's will furnish a Resident Project Representative to assist <br /> 00700 - 29 <br />