Laserfiche WebLink
SECTION 00800 = SUPPLEMENTARY CONDITIONS <br /> TO THE GENERAL CONDITIONS <br /> TABLE OF CONTENTS <br /> Article Title Article Number <br /> Introduction SC - 1 . 00 <br /> Defined Terms SC — 1 . 01 <br /> Terminology SC — 1 . 02 <br /> Before Starting Construction SC —2. 05 <br /> Pre-Construction Conference SC — 2 . 06 <br /> Coordination of Plans, Specifications , and Special Provisions SC — 3. 06 <br /> Subsurface and Physical Conditions SC — 4. 02 <br /> Differing Subsurface or Physical Conditions SC - 4. 03 <br /> Hazardous Environmental Conditions at Site SC - 4. 06 <br /> Performance, Payment and Other Bonds SC — 5 . 01 <br /> Certificates of Insurance SC — 5. 03 <br /> CONTRACTOR'S Liability Insurance SC — 5 . 04 <br /> OWNER's Liability Insurance SC — 5. 05 <br /> Property Insurance SC — 5 . 06 <br /> Waiver of Rights SC — 5 . 07 <br /> Receipt and Application of Insurance Proceeds SC — 5 . 08 <br /> Labor; Working Hours SC — 6 . 02 <br /> Substitutions and "Or-Equals" SC — 6 . 05 <br /> Concerning Subcontractors , Suppliers , and Others SC — 6 . 06 <br /> Permits SC — 6 . 08 <br /> Shop Drawings and Samples SC — 6 . 17 <br /> Indemnification SC - 6 . 20 <br /> Replacement of Engineer SC — 8 . 02 <br /> Decisions on Requirements of Contract Documents <br /> 00800 - Supplementary Conditions 2006041 <br /> 00800 1 <br /> F 1Pubhc Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT00600 Supplementary Conditions 2006041 dco Rev. 05/01 <br />