My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-2 .06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Engineer will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the Work and to discuss schedules referred to in paragraph 2. 05. 13 , procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records. Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work. <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3. 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows: <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 . Specifications <br /> 4. Supplementary Conditions to the General Conditions <br /> 5. General Conditions <br /> 6 . Approved Shop Drawings <br /> 7. Drawings <br /> 8. Referenced Standards. <br /> B. Written/computed dimensions shall govern over scaled dimensions. <br /> SC-4.02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site: <br /> 1 . Roadway Soil Survey — 201h Avenue to Lateral J Canal dated January 2001 <br /> 2. Proposed Pond Sites and Treatment Swale — Oslo Road Widening 201h <br /> Avenue to Lateral J Canal , dated January 2001 <br /> 3 . Roadway Soil Survey & Pond Subsurface Exploration — Oslo Road Widening <br /> from 201h Avenue to 27th Avenue , dated July 2005 <br /> 4 . Technical Memorandum — Proposed Pond 400 Oslo Road Widening , dated <br /> October 2005 <br /> D. Reports and drawings itemized in SC-4.02 . 0 are not included with the Bidding <br /> Documents. Copies may be examined at Indian River County Administration <br /> Building , Capital Projects, 2nd Floor, 1840 25th Street, Vero Beach , FL 32960 during <br /> regular business hours. These reports and drawings are not part of the Contract <br /> Documents . <br /> 00800 - Supplementary Conditions 2006041 <br /> 008004 <br /> f\Public Wogs\Capital Protetla\Oslo Road\Oslo Widening. Old Dixie to 27th Ave1CONTRACT DOCUMEN500800 - Supplementary Conditions 2006041 doc Rev 0901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.