My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Major changes in scope . <br /> 2 . Activities modified since the previous submission . <br /> 3 . Revised projections of progress and completion . <br /> 4 . Other identifiable changes . <br /> C . Provide a narrative report as needed to define : <br /> 1 . Problem areas , anticipated delays , and the impact on the schedule . <br /> 2 . Corrective action recommended and its effect. <br /> 3 . The effect of changes on schedules of other prime contractors . <br /> 1 . 3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br /> On or before the tenth day after the effective date of the Agreement, submit the <br /> initial schedules to the ENGINEER. The ENGINEER will review the schedules and <br /> return a review copy to the CONTRACTOR within 21 days after receipt. If required <br /> by the ENGINEER , resubmit revised schedules on or before the seventh day after <br /> receipt of the review copy. If required by the ENGINEER, submit revised monthly <br /> progress schedules with that month 's application for payment. <br /> 1 .4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br /> A. After receiving approval by the ENGINEER, distribute copies of the <br /> approved initial schedule and all reviewed revisions (updated ) to: <br /> 1 . Job site file . <br /> 2 . Subcontractors. <br /> 3 . Other concerned parties . <br /> 4 . OWNER (two copies). <br /> 5. ENGINEER <br /> B . In the cover letter, instruct recipients to report promptly to the <br /> CONTRACTOR , in writing , any problems anticipated by the projections <br /> shown in the schedules . <br /> SECTION 01520 CONSTRUCTION FACILITIES AND <br /> TEMPORARY CONTROLS <br /> 1 . 1 SCOPE <br /> A. Provide all construction equipment and facilities and temporary controls <br /> required to satisfactorily complete the work represented on the Drawings <br /> and described in the Specifications . <br /> GENERAL REQUIREMENTS <br /> GR-9 <br /> FAPublic Works\Capital Projects%Oslo Road\Oslo Widening , Old Dixie to 27th Ave1CONTRACT DOCUMENTUVISION 1 - General <br /> Requirements.doc <br /> 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.