Laserfiche WebLink
1 .4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract, but the <br /> CONTRACTOR shall provide inspection of work area daily and shall take whatever <br /> measures are necessary to protect the safety of the public, workmen , and materials , <br /> and provide for the security of the site , both day and night. <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work of <br /> this Contract . In dry weather, spray dusty areas daily with water in order to control <br /> dust. Take necessary steps to prevent the tracking of mud onto adjacent streets and <br /> highways . <br /> 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities , services , and controls and legally dispose of <br /> them as soon as the work is complete. The areas of the site used for temporary <br /> facilities shall be properly reconditioned and restored to a condition acceptable to the <br /> OWNER. <br /> SECTION 01541 PROTECTION OF THE WORK AND <br /> PROPERTY <br /> 1 . 1 GENERAL <br /> A. CONTRACTOR shall be responsible for taking all precautions , providing all <br /> programs , and taking all actions necessary to protect the Work and all public and <br /> private property and facilities from damage as specified in the General Conditions <br /> and herein . <br /> B . In order to prevent damage , injury or loss , CONTRACTOR'S actions shall include , <br /> but not be limited to , the following : <br /> 1 . Store apparatus , materials , supplies, and equipment in an orderly, safe <br /> manner that will not unduly interfere with the progress of the Work or the <br /> Work of any other Contractor or utility service company. <br /> 2 . Provide suitable storage facilities for all materials , which are subject to injury by <br /> exposure to weather, theft, breakage , or otherwise . <br /> 3 . Place upon the Work or any part thereof, only such loads as are consistent <br /> with the safety of that portion of the Work. <br /> 4 . Clean up frequently all refuse , rubbish , scrap materials, and debris caused by <br /> construction operations , so that at all times , the site of the Work presents a <br /> safe, orderly, and workmanlike appearance . <br /> 5 . Provide barricades and guard rails around openings , for scaffolding , for <br /> temporary stairs and ramps, around excavations , elevated walkways and <br /> other hazardous areas. <br /> C . Except after written consent from proper parties , do not enter or occupy <br /> privately-owned land with men , tools , materials or equipment, except on <br /> easements provided herein . <br /> GENERAL REQUIREMENTS <br /> GR- 11 <br /> FAPublic Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENT\DIVIS ION 1 - General <br /> Requirements.doc <br /> 5123101 <br />