construction activities within two (2 ) days . Irrigation systems partially within the right- <br /> of-way of Kings Highway and all intersecting side streets within project limits may be <br /> cut off and capped or connected to same system to maintain functionality. The <br /> CONTRACTOR shall be responsible for maintaining the functionality of the remaining <br /> portion of the system if it should fall outside of the right-of-way. <br /> 1 . 5 PROTECTION OF EXISTING STRUCTURES <br /> A. Underground Structures : <br /> 1 . Underground structures are defined to include , but not be limited to , all sewer, <br /> water, gas , and other piping , and manholes , chambers , electrical conduits , <br /> tunnels and other existing subsurface work located within or adjacent to the <br /> limits of the Work. <br /> 2 . All underground structures known to ENGINEER except service connections <br /> for water, sewer, electric, and telephone are shown . This information is <br /> shown for the assistance of CONTRACTOR in accordance with the best <br /> information available , but is not guaranteed to be correct or complete . The <br /> existing utilities shown on the Contract Drawings are located according to the <br /> information available to the ENGINEER at the time the Drawings were <br /> prepared and have not been independently verified by the OWNER or the <br /> ENGINEER . Guarantee is not made that all existing underground utilities are <br /> shown or that the locations of those shown are accurate . The locations <br /> shown are for bidding purposes only. Finding the actual location of any <br /> existing utilities is the CONTRACTOR's responsibility and shall be done <br /> before it commences any work in the vicinity. Furthermore, the <br /> CONTRACTOR shall be fully responsible for any and all damages , which <br /> might be occasioned by the CONTRACTOR's failure to exactly locate and <br /> preserve any and all underground utilities . The OWNER or ENGINEER will <br /> assume no liability for any damages sustained or costs incurred because of <br /> the CONTRACTOR's operations in the vicinity of existing utilities or <br /> structures , nor for temporary bracing and shoring of same . If it is necessary <br /> to shore , brace , or swing a utility, contact the utility company or department <br /> affected and obtain their permission regarding the method to use for such <br /> work. <br /> 3 . Contact the various utility companies which may have buried or aerial utilities <br /> within or near the construction area before commencing work. Provide 48 <br /> hours minimum notice to all utility companies prior to beginning construction . <br /> 4 . Schedule and execute all work involving existing utilities in order to minimize <br /> necessary interruption of services . Whenever such interruption is necessary <br /> for completion of the work, notify the ENGINEER and the appropriate utility at <br /> least 48 hours in advance . Perform all work to repair/restore utility service to <br /> the satisfaction of the appropriate utility. Include all costs related to service <br /> maintenance, interruption , and restoration in the appropriate line item in the <br /> Contract. <br /> GENERAL REQUIREMENTS <br /> GR-13 <br /> FSPublic Works\Capital Projects\Oslo Roadloslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENTIDIVISION i - General <br /> Requirements.doc <br /> 5/23101 <br />