Laserfiche WebLink
the Lump Sum payment for Record Drawings . A partial payment will be <br /> allowed for the before cross-sections not to exceed 10 % of the Lump Sum <br /> bid amount for Record Drawings . <br /> 8 . Utilities : <br /> Record Drawings for water and sewer utilities shall comply with Drawings <br /> M- 15 , M16 , M1 6(A) , M1 6 ( B ) of the Indian River County Department of Utility <br /> Services Water and Wastewater Utility Standards dated September 1 , 2004 . <br /> 1 . 3 AS-BUILTS <br /> A. CONTRACTOR shall submit marked up Record Drawings to <br /> COUNTY . COUNTY will input As-Built information on Electronic <br /> Drawing files . <br /> B . COUNTY shall deliver to CONTRACTOR seven (7 ) sets of As-Builts <br /> plotted from electronic files with the marked up Record Drawings . <br /> C . CONTRACTOR's surveyor shall review, sign and seal As- Builts . <br /> CONTRACTOR shall return marked up Record Drawings and six (6 ) <br /> sets of signed and sealed As-Builts to COUNTY. <br /> D . Payment for Record Drawings , Review of Electronic As-Builts and <br /> signing and sealing As-Builts shall be made under Pay Item No . 100- <br /> 99 — Record Drawings — Lump Sum . <br /> 1 .4 ACCURACY <br /> The CONTRACTOR will be held responsible for the accuracy of Record Drawings <br /> and Electronic As-Builts and shall bear any costs incurred in finding utilities as a <br /> result of incorrect data furnished by the CONTRACTOR . <br /> 1 . 5 SUBMITTAL <br /> Upon Substantial Completion of the Work, deliver Record Drawings to ENGINEER . <br /> Final payment will not be made until satisfactory record documents are received by <br /> ENGINEER. <br /> SECTION 01820 POST FINAL INSPECTION <br /> 1 . 1 GENERAL <br /> A. Approximately one year after Substantial Completion , the OWNER will make <br /> arrangements with the ENGINEER and the CONTRACTOR for a post final <br /> inspection and will send a written notice to said parties to inform them of the date <br /> and time of the inspection . <br /> B . Corrections of defective work noted by OWNER and ENGINEER shall comply with <br /> the applicable sections of Article 13 , General Conditions . <br /> C . After the inspection , the OWNER will inform the CONTRACTOR of any corrections <br /> required to release the performance and payment bonds . <br /> GENERAL REQUIREMENTS <br /> GR-24 <br /> F,\Public Works\Capital Projects\Oslo Road\Oslo Widening, Old Dixie to 27th Ave\CONTRACT DOCUMENTTIVISION 1 - General <br /> Requirements .doc <br /> 512T01 <br />