ARTICLE 7 - INDEMNIFICATION
<br /> 7 .01 CONTRACTOR shall indemnify OWNER , ENGINEER, and others in accordance with
<br /> paragraph 6 .20 ( Indemnification) of the General Conditions to the Construction Contract.
<br /> ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br /> following representations :
<br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br /> other related data identified in the Bidding Documents.
<br /> B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
<br /> general , local , and Site conditions that may affect cost, progress , and performance of the
<br /> Work .
<br /> C. CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and
<br /> Regulations that may affect cost, progress, and performance of the Work .
<br /> D. CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of
<br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions
<br /> in or relating to existing surface or subsurface structures at or contiguous to the Site
<br /> (except Underground Facilities) which have been identified in the Supplementary
<br /> Conditions as provided in paragraph 4 .02 of the General Conditions and (2) reports and
<br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been
<br /> identified in the Supplementary Conditions as provided in paragraph 4. 06 of the General
<br /> Conditions.
<br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br /> done so) all examinations, investigations, explorations, tests, studies, and data concerning
<br /> conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site
<br /> which may affect cost, progress, or performance of the Work or which relate to any aspect
<br /> of the means, methods, techniques, sequences, and procedures of construction to be
<br /> employed by CONTRACTOR , including applying the specific means, methods ,
<br /> techniques , sequences, and procedures of construction , if any, expressly required by the
<br /> Contract Documents to be employed by CONTRACTOR , and safety precautions and
<br /> programs incident thereto
<br /> F. CONTRACTOR does not consider that any further examinations, investigations ,
<br /> explorations, tests, studies , or data are necessary for the performance of the Work at the
<br /> Contract Price , within the Contract Times , and in accordance with the other terms and
<br /> conditions of the Contract Documents.
<br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br /> others at the Site that relates to the Work as indicated in the Contract Documents .
<br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and
<br /> observations obtained from visits to the Site, reports and drawings identified in the
<br /> Contract Documents, and all additional examinations, investigations, explorations, tests,
<br /> studies, and data with the Contract Documents .
<br /> 00520 - Agreement (Public Works) 2006091
<br /> 00520 - 5
<br /> C90acuments and Set ingsU jacksont wal Settings\Tenporary Internet Files\OLK66W0520 - Agreement (Public Works) 2006091 .dm Rev. 05101