My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br /> Date of Issuance: 20 <br /> OWNER : Indian River County <br /> CONTRACTOR- <br /> Contract: <br /> Project : Oslo Road (CR 606 ) Phase I Roadway Widening <br /> OWNER's Contract No. <br /> ENGINEER's Project No. <br /> CONTACT FOR : Oslo Road (CR 606) Phase I Roadway Widening <br /> ( Insert Name of Contract as it appears in the Bid Documents) <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br /> to the following specified parts thereof: <br /> To - <br /> OWNER <br /> And Top, <br /> CONTRACTOR <br /> The Work to which this Certificate applies has been inspected by authorized representatives of <br /> OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br /> substantially complete in accordance with the Contract Documents on <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected is attached hereto . This list may not be all- <br /> inclusive, and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents . The <br /> items in the tentative list shall be completed or corrected by CONTRACTOR within days <br /> of the above date of Substantial Completion . <br /> 00630 - 1 00630 - Certificate of Substantial Completion <br /> F:1Publlc Works\Capllal Projects\Oslo RoadtOslo Widening, Old Dixie to 27Ih AvetGONTRACT DOCU ME NT00630 - Certificate of Substantial Completion duc Rev_ 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.