Laserfiche WebLink
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or <br /> modification. This document should be adapted to the particular circumstances of the contemplated Project and the <br /> Controlling Law. <br /> STANDARD <br /> GENERAL CONDITIONS <br /> OF THE <br /> CONSTRUCTION CONTRACT <br /> Prepared by <br /> ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE <br /> and <br /> Issued and Published Jointly By <br /> [INSERT LOGOS] <br /> PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE <br /> a practice division of the <br /> NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS <br /> AMERICAN CONSULTING ENGINEERS COUNCIL <br /> AMERICAN SOCIETY OF CIVIL ENGINEERS <br /> This document has been approved and endorsed by <br /> The Associated General [seal] Contractors of America <br /> Construction Specifications Institute <br /> [seal] <br /> These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910-8-A- I or 1910-8- <br /> A-2) ( 1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other. <br /> Comments concerning their usage are contained in the EJCDC User's Guide (No. 1910-50). For guidance in the <br /> preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910- 17) ( 1996 <br /> Edition). <br /> EJCDC No. 1910-8 (1996 Edition) <br />