Laserfiche WebLink
A <br /> FALCON TRACE - PLAT 5 <br /> OUST ESTIMATE <br /> TOTAL: $ 881, 094.48 <br /> 11 Contingency (5% $ 44,054.72 <br /> TOTAL CONSTUCTION COST <br /> (Including 5% Contingency): $925, 149. 20 <br /> PLAT 5 � BOND AMOUNT <br /> (125 % of Totai Const. frost) IL1z ._ 43 , 5 <br /> 3 of 3 6/2712005 <br />