My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-146
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:09:54 AM
Creation date
9/30/2015 7:49:23 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverwind Phase II <br /> Estimated Site Construction Cost <br /> A <br /> i r <br /> ll I MAINE <br /> Roadw Sod LS 1 $ 11287.00 $ 19287.00 <br /> Lake Slope Sod LS 1 $ 15 958.80 $ 151958.80 <br /> Berms CY 889 4. 00 $3,556.00 <br /> Hedges Unit 320 7.50 $2 400.00 <br /> Trees (Canopy) Unit 80 175. 00 $ 14 000. 00 <br /> Trees Understo Unit 32 75. 00 $2,400.00 <br /> , inrigatiDn LS 1 159000. 00 $ 15,000.00 <br /> Total Landscape Construction $ 54,601 .80 <br /> Construction Layouts LS 1 $ 25 000.00 $ 259000.00 <br /> Street Lighting LS 1 $ 15 000.00 $ 15 000.00 <br /> Electrical Conduits LS 1 $ 37 000. 00 $ 37,000.004 <br /> Permanent Reference Monument Unit 25 $ 200. 00 $ 5,000.00 5, �-� .0 <br /> Permanent Control Point Unit 14 $ 125. 00 $ 1 ,750. 00 <br /> Total $ 839750.00 <br /> Total Estimated Construction Cost $1 ,090,988.53 <br /> Engineering/Survey/Inspection (16%) 163, 648.28 <br /> Construction/EngineeringiSunvWnspection (Total) $1 r25496536,811 <br /> Performance Bond (16%) 188, 195.52 <br /> Performance Bond (Total) $1 ,442,832.33 <br /> STEPHEN E. MOLER, P. E. FLORIDA #33193 <br /> V PRESIDENT <br /> APR 3 0 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.