Laserfiche WebLink
ALCON TRACE - PLA= <br /> C $T ESTIMATE <br /> DEMOLITION / PAVEMENT REMOVAL LS 1 .00 12, 500. 00 $ 12,500.00 <br /> FILL / GRADING LS 1 .00 36, 500. 00 $ 36, 500.00 <br /> STABILIZED SUBGRADE SY 41700. 00 2. 50 $ 11 ,750.00 <br /> BASE SY 41700.00 10. 00 $ 47,000.00 <br /> ASPHALT SY 81200 .00 10. 00 $ 827000.00 <br /> CONCRETE WALKS SY 22205.00 29. 15 $ 64,275. 75 <br /> DRAINAGE / CURBING LS 1 . 00 15,000.00 $ 15,000.00 <br /> SIGNS & STRIPING PAINT 1st LIFT LS 1 . 00 83500.00 $ 81500.00 <br /> SOD SY 2.00 11000.00 $ 2, 000.00 <br /> M.O.T. LS 1 .00 51000. 00 $ 5, 000. 00 <br /> ENGINEERING, SURVEY, & INSPECTION LS 1 .00 51000. 00 $ 51000.00 <br /> MISCELLANEOUS LS 1 .00 15,000. 00 $ 15,000. 00 <br /> 21st Street SW Subtotal: $ 3149525.75 <br /> OFF-SITE TOTAL: $ 314, 525. 75 <br /> 12 On-site / Otfftsite Contingency 5% $ 52, 71.3.06 <br /> ON-SITE & OFF SITE TOTAL COST: <br /> (Including 5% Contingency) $1, 106, 974. 28 <br /> PLAT 3 - BOND AMOUNT <br /> (125% of Total Const. Cost) $ 1 , 383, 717, 85 <br /> 3 of 3 6/27/2005 <br />