Laserfiche WebLink
SCHEDULE 8 - Survey Markers & Asbuilts <br /> 1 Permanent Reference Points 1 LS 21500 . 00 $ 21500. 00 <br /> 2 Lot Corners 1 LS 41500 . 00 $ 41500. 00 <br /> 3 As-builts 1 LS 15 , 500 . 00 $ 15,500. 00 <br /> TOTAL SCHEDULE 8 $ 229500. 00 <br /> TOTAL CONSTRUCTION COST ESTIMATE $1 ,7765023 .27 <br /> MINUS BILLING THROUGH 5/31 /05 $ 1 ,043,533.40 <br /> COST TO COMPLETE PHASE 1 CONSTRUCTION $732,489. 87 <br /> ADD FOR ENGINEERING 10% 73,248w99 <br /> TOTAL CONSTRUCTION COST ESTIMATE FOR BOND $805 ,738.86 <br /> ADD FOR PERFORMANCE BOND 26% 25% $ 201 ,434 .71 <br /> TOTAL PERFORMANCE BOND AMOUNT $ 11007,173 .57 <br /> PREPARED BY M TELLER & MOLER, INC . <br /> C :7 <br /> John/M . Boyer, P. E. FL #57970 <br /> Proj ct Engineer <br /> ` ^ fmv, <br /> Page 4 of 4 <br />