Laserfiche WebLink
08 / 08 / 2005 15 : 07 7725694317 COATTV PAGE 08 <br /> w <br /> New Paving (2. 5" Thk) SY 930 $ 10.35 $9,525. 50 <br /> Paving Overlay ( 1 " Thk) SY 2, 376 $ 4. 15 $9185825 <br /> 8" Base Course SY 930 $ 15. 30 $ 141229.00 <br /> 12" Subgrade SY 11163 $ 4. 85 $51840, 55 <br /> Curbing (Type F') LF 11515 $ 10.45 $ 15, 831 . 75 <br /> Type 5 Inlet (Type "P" Bottom ) EA 5 $ 2,800. 00 $ 13, 000. 00 <br /> 18" RCP LF 517 $ 39. 50 $20, 421 . 50 <br /> MtNmW End Section EA 1 $ 660. 00 $980.00 <br /> Guard Rail LF 690 $ 15. 00 $ 10, 350.00 <br /> 12" Dia Water Main U= 11520 $ 15. 00 $221800400 <br /> 17' Dia. Gate Val" EA 3 $ 11900. 00 $ 5, 700. 00 <br /> Fire Hydrants (Complete) EA 1 $ 1 ,575 , 00 $ 11575, 00 <br /> Signage/Pavement Markings LS 1 $ 5 , 000, 00 $5,000800 <br /> Bahia Sod (R/W) SY 10700 $ 1 . 75 $2, 975. 00 <br /> Grading AC 1 $ 1 , 000. 00 $ 13250. 00 <br /> 17131a . Force Main LF 21500 $ 38, 00 $95 ,000000 <br /> 12" Dia , Gate Valve EA 3 $ 61500.00 $196500. 00 <br /> 17' Dla, Force Main ( Dir. Bore) LF 100 $ 120. 00 $121000, 00 <br /> 17'x24" Wet Tap Fro 1 $ 11 , 500. 00 $ 11 ,500 . 00 <br /> Set . C. P. 's and Lot Comers LS 1 $ 81300. $8, 500. 00 <br /> As-bunts LS 1 $ 17, 000. 00 $ 17, 000 ,00 <br /> CONSTRUCTION COST ESTIMATE (OFFSITE IMPROVEMENTS) $30T 'STS.05 <br /> TOTAL CONSTRUCTION COST ESTIMATE $ 2, 134,9152,90 <br /> ADD FOR ENGINEERING (10%) $ 219.4WUD <br /> TOTAL, CONSTRUCTION COST ESTIMATE FOR BOND # Z,34g,448, 1 $ <br /> ADD FOR PERFORMANCE BOND (25%) $ _ _ $871112.05 <br /> TOTAL MRIFORMCFE BOND AMOUNT ; 2jWv860w24 <br /> REP D BY 1MASTCLLER & MOLER, INC. 0 <br /> Stephen B. Moler, P.E. . M~33193 <br /> Vice Preslderrt - <br /> Pape 3 of 3 <br />