Laserfiche WebLink
r <br /> 1 -Jun-05 <br /> Lexington Place Phase One Sidewalk Cost Estimate <br /> SCHEDULE 1 - SIDEWALK <br /> Unit <br /> Item Description Quantity Unit Price Total <br /> 1 4" Thick Concrete Sidewalk 51524 SF 3. 50 $19,334.00 <br /> TOTAL SCHEDULE 1 $19,334.00 <br /> TOTAL SIDEWALK COST ESTIMATE $19,334.00 <br /> ADD FOR ENGINEERING 10% 1 1 ,933.40 <br /> TOTAL CONSTRUCTION COST ESTIMATE FOR BOND $219267 .40 <br /> ADD FOR PERFORMANCE BOND 25% 25% $ 59316.85 f _ <br /> TOTAL PERFORMANCE BOND AMOUNT $ 269584.25 <br /> PREPARED BY MASTELLER & MOLER, INC. <br /> f 1 , <br /> hn . . Bo r, P. E. FL (/57970 <br /> ro'ect Eng neer <br /> Page 1 of 1 <br />