My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-216B
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-216B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:26:11 PM
Creation date
9/30/2015 8:52:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/21/2005
Control Number
2005-216B
Agenda Item Number
7.H.
Entity Name
Sunland Development Inc.
Subject
Contract construction of required sidewalk improvements
Area
Lexington Place Subdivision Phase I
Supplemental fields
SmeadsoftID
5019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 -Jun-05 <br /> Lexington Place Phase One Sidewalk Cost Estimate <br /> SCHEDULE 1 - SIDEWALK <br /> Unit <br /> Item Description Quantity Unit Price Total <br /> 1 4" Thick Concrete Sidewalk 51524 SF 3. 50 $19,334.00 <br /> TOTAL SCHEDULE 1 $19,334.00 <br /> TOTAL SIDEWALK COST ESTIMATE $19,334.00 <br /> ADD FOR ENGINEERING 10% 1 1 ,933.40 <br /> TOTAL CONSTRUCTION COST ESTIMATE FOR BOND $219267 .40 <br /> ADD FOR PERFORMANCE BOND 25% 25% $ 59316.85 f _ <br /> TOTAL PERFORMANCE BOND AMOUNT $ 269584.25 <br /> PREPARED BY MASTELLER & MOLER, INC. <br /> f 1 , <br /> hn . . Bo r, P. E. FL (/57970 <br /> ro'ect Eng neer <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.