Laserfiche WebLink
EM" Kimley-Horn <br />LL�� and Associates, Inc. <br />3/13/2006 <br />Serenoa Phase I Job No. 047791000 <br />Engineer's Opinion of Probable Costs For Construction and Engineering <br />Not Complete by Time of Plat Approval Consideration <br />ITEM UNIT QUANTITY UNIT COST COST % Complete Remaining Cost <br />PAVING <br />UNIT <br />QUANTITY <br />UNIT COST <br />COST <br />%Complete <br />Remaining Cost <br />B^COMPACTED SUBRADE <br />&Y. <br />11,595 <br />$5.00 <br />$57,975.00 <br />100.00% <br />$0.00 <br />PERMANENT CONTROL POINTS <br />6^LIMEROCK BASE <br />S.Y. <br />11,595 <br />$11.50 <br />$133,342.50 <br />100.00% <br />$0.00 <br />LS <br />1.T TYPE S ASPHALT <br />S.Y. <br />11,595 <br />$6.25 <br />$72,468.75 <br />100.00% <br />$0.00 <br />1 <br />PROJECT SIGNAGE <br />LS <br />1 <br />$3,500.00 <br />$3,500.00 <br />0.00% <br />$3,500.00,�� <br />EMERGENCY ACCESS <br />COMPACTED SUBGRADE <br />S.Y. <br />1,150 <br />$5.00 <br />$5,750.00 <br />0.00% <br />$5,750.00 <br />% Complete <br />Remaining Cost <br />LANDSCAPE & IRRIGATION AT ENTRANCE DR <br />LS <br />1 <br />$25,000.00 <br />$25,000.00 <br />0.00% <br />EMERGENCY ACCESS LIMEROCK BASE <br />S.Y. <br />1,150 <br />$11.50 <br />$13,225.00 <br />0.00% <br />$13,225.00 <br />n , <br />$30,000.00 ry <br />TEMPORARY T TURNAROUND <br />LS <br />1 <br />$8,500.00 <br />$8,500.00 <br />0.00% <br />$8,500.00 <br />(EROSION CONTROL) <br />TYPE D CURB (ENTRANCE) <br />LF <br />650 <br />$7.95 <br />$5,167.50 <br />100.00% <br />$0.00 <br />SF <br />STRIPING (Clubhouse and Entrance) <br />LS <br />1 <br />$2,500.00 <br />$2,500.00 <br />0.00% <br />$2,500.00 <br />Subtotal Paving <br />$77,672.50 <br />$77,672.50 <br />$302,428.75 <br />$33,475.00 <br />$1,536,804.35 <br />SURVEY <br />UNIT <br />QUANTITY <br />UNIT COST <br />COST <br />% Complete <br />Remaining Cost <br />SET LOT CORNERS <br />LS <br />1 <br />$9,000.00 <br />$9,000.00 <br />100.00% <br />$0.00 <br />PERMANENT CONTROL POINTS <br />LS <br />1 <br />$600.00 <br />$600.00 <br />100.00% <br />$0.00 <br />MAINTENANCE OF PCP <br />LS <br />1 <br />$800.00 <br />$800.00 <br />0.00% <br />$800.00 <br />MAINTENANCE OF PRM <br />LS <br />1 <br />$800.00 <br />$800.00 <br />0.00% <br />$800.00 <br />Subtotal Survey <br />$11,200.00 <br />,-+',15A41 <br />$1,600.00 <br />Landscaping (Common Area) <br />UNIT <br />QUANTITY <br />UNIT COST <br />COST <br />% Complete <br />Remaining Cost <br />LANDSCAPE & IRRIGATION AT ENTRANCE DR <br />LS <br />1 <br />$25,000.00 <br />$25,000.00 <br />0.00% <br />$25,000.00 <br />LANDSCAPE& IRRIGATION AT CLUBHOUSE <br />LS <br />1 <br />$30,000.00 <br />$30,000.00 <br />0.00% <br />n , <br />$30,000.00 ry <br />SOD FOR DETENTION PONDS <br />/ <br />(EROSION CONTROL) <br />LS <br />1 <br />000 <br />$18,.00 <br />$18,000.00 <br />0.00% <br />$18,000.00 <br />SOD ALONG STABILIZED EMERG EXIT <br />SF <br />13,350 <br />$0.35 <br />$4,672.50 <br />0.00% <br />$4,672.50 ` <br />Subtotal Landscaping <br />$77,672.50 <br />$77,672.50 <br />GRAND TOTAL <br />$1,536,804.35 <br />$199,331.60 <br />SECURITY (125%)$249,164.50 <br />PERCENT COMPLETE AS OF 3/13/2006 <br />87.05 <br />I, Peter J. Van Rens, a Florida registered engineer, License #55553, do hereby certify to Indian <br />River County that an opinion of probable cost has been prepared under my responsible direction for <br />those improvements itemized in this exhibit, and that the total opinion of probable cost for said <br />improvements is $199,331.60. This opinion of probable cost has been prepared, in part, to induce approval <br />by the County of a final plat for the Serenoa Subdivisio and for the purpose of establishing <br />surety amounts associated with items not complete by1jigtirgie of approval of the plat. <br />Engineer -of -Record Signature: <br />Date: <br />Van <br />EE# CA00000696 <br />d i� Imo✓ I . <br />page 2 Of 2 Gd47791oomENGtCOST ESI FInalBondooc 477910002-23-06.xls <br />