Laserfiche WebLink
FLORIDA EL COAST RAILWAY COMPANY L�oesr.vnca> 04/30/04 <br /> SALYT AUGU::TINE, FLORIDA 09 :47 <br /> VERO BEACH: WIDEN THE EXIST. 74 ' WIDE TYPE " T" CONC. GRADE CROSSING WITH A 88 ' VPIDE OMNI CROSSING. <br /> 16TH STREET, MILEPOST 228+118' AAR/DOT NO . 272195P <br /> FILE : 228!39/118 <br /> CROSSD�'G DESCRIPTION PAVING DESCRIPTION' <br /> New Length of Crossing Surface: 88 Tf Width (Across Road) 88 Ft <br /> Number of Tracks: ,� 1 Ea Length (Along Road) 80 Ft <br /> Length of Track Panel: 128 Tf Projected Lift 3 In <br /> AGREEMENT DESCRIPTION GANG DESCRIPTION <br /> Responsible Party: FDOT 3 Fon Pierce Section <br /> Agreement Date: 14 Fort Pierce Smoothing <br /> Division of Responsibility 2 Crane <br /> Encase Fiber Optic Cable FDOT 2 Loader <br /> Maintenance of Traffic FDOT <br /> Crossing Surface FDOT <br /> Track Materials FDOT <br /> Track Construction FDOT <br /> Paving FDOT <br /> COST RECAPITULATION Salvage 10 . 00% Responsible <br /> Track & Civil Work Item Labor Eauinment Material Contract Credit Contineency Total P� <br /> Encase Fiber Optic Cable n/a n/a n/a 6,000.00 n/a 600.00 6,600 . 00 FDOT <br /> Mobilization/Material Consolidation 1 ,786 . 68 2 ,607 .20 n!a n!a n/a 406. 12 3 ,800.00 FDOT <br /> Construct Track Panel 1 ;311 .07 1 ,239 . 82 10,784.29 n/a n/a 1 ,364. 83 14 ,700 .00 FDOT <br /> Maintenance of Traffic/PoIice Protection n/a n/a n/a 16,700 .00 n/a 1 ,700.00 18 ,400 .00 FDOT <br /> Remove Crossing Surface 463 . 12 579 . 33 n/a n/a 0 .00 157. 55 1 ,200 . 00 FDOT <br /> Remove/Replace Track/Crossing Structure 2,456 .33 3 ,002 . 80 n/a n/a 0.00 640 . 87 6, 100 . 00 FDOT <br /> Line & Surface Track 851 . 82 651 . 83 8 ,352 .00 n/a n!a 1 ,044. 36 ] 0,900 .00 FDOT <br /> Replace Crossing Surface SSD.74 688 .93 24, 107. 12 n/a nia 2,553 .21 27 ,900 .00 FDOT <br /> Place Asphalt 168.50 28 .45 n/a 19 , 800.00 n!a 2,003 . 06 22,000.00 FDOT <br /> Demobilization/Site Cleanup 469 .00 67 .48 n/a n/a n/a 63 .52 60D.00 FDOT <br /> Totals : 8 .057.25 7, 865 . 83 43 ,243 .41 42,500.00 0.00 10,533 . 51 112,200. 00 <br /> TOTAL TRACK PROJECT COST: $ 112,200.00 1 ,275 .00 5/Ft <br /> ENGINEERING & SUPERVISION: 4 ,488.00 <br /> TOTAL TRACK & CIVIL PROJECT COST: 5116,688 .00 <br /> TOTAL SIGNAL IMPROVEMENT PROJECT COST: 322,180.00 <br /> #REF ! <br /> TOTAL COST TO BE BORNE BY FDOT: 5438,868.00 <br /> NOTE: THIS IS AN ESTIMATE ONZY, ALL CHARGES WILL BE BASED ON ACTUAL COST. moe�: v,ia.�xa �inim <br />