Laserfiche WebLink
II . WATER VOLUME : Yes No B11Pc <br /> Irrigation Pracrices: <br /> 1 ) . Are irrigation events scheduled based on : <br /> • evapotranspiration (ET ) Al , D15 <br /> • rainfall events, _ , L = A17 D15 <br /> • and/or other scientific data? _ _ Al , D15 <br /> Infrastructure: <br /> 2 ) . Are existing canals and ditches maintained periodically ? A7, B ? <br /> 3 ) . Can on- site detention or storage be provided using. the present A6- 7, 9 <br /> system of canals and ditches ? <br /> 4) . Is there an on- site reservoir? U = A9 <br /> Drarizage Manag, ement. <br /> 5) . Are pumps and/or discharge structures setup to achieve uniform A2 -3 , 7- 8 <br /> drainage throughout the Grove 7 <br /> 6) . Are drainage events managed according to a Drainage 2:1 Al -3 <br /> 6- 7 <br /> Management Plan? <br /> Water Table Management. <br /> 7) . Are groundwater levels monitored to meet tree water demands <br /> and prevent root pruning by: <br /> • soil moisture probes 0 J Al -2, 5 -6 <br /> • tensiometers l7 ❑ A1 -2, 5 -6 <br /> • water table observation wells t7 0 Al -2, 5 -6 <br /> 2 <br />