My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-231H
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-231H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:11:51 AM
Creation date
9/30/2015 8:15:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/12/2004
Control Number
2004-231H
Agenda Item Number
7.K.
Entity Name
Robert J. Lindsey
Subject
Cost Share Grant Contract
Citrus Best Management
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4563
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111. SEDIMENT : Yes No BMPs <br /> Drainage Structures: <br /> 8 ) . Are culverts with functional riser/sinker boards installed ❑ ❑ B1 <br /> on appropriate lateral and side ditch connections ? <br /> 9 ) . Are the culvert structures properly installed and maintained ? ❑ L] B1 <br /> Ditch Infrastructure <br /> 10) . Are there settling basins or sumps to trap sediment at field ditch 0 ❑ B2 <br /> connections to laterals and other main canals prior to discharge ? <br /> 11 ) . Are these basins maintained at an appropriate frequency ? ❑ ❑ B2 <br /> 12) . Are ditches and canals constructed with proper side ❑ 0 B3 <br /> bank stabilization methods ; i . e . sloping or shoring ? <br /> Ditch Management: <br /> 13 ) . Is vegetative cover maintained near canal or ditch banks ? ❑ ❑ B4, B5 <br /> 14) . Are there vegetative buffer strips maintained near environmentally ❑ 11.7 B4 <br /> sensitive lands? <br /> 15 ) . Are measures taken to prevent side-bank erosion due to the flow 0 ❑ B8 <br /> of water directly down the sides of the banks (i . e . berms) ? <br /> 16) . Are riprap, concrete headwalls, sandbags, or wingwalls 0 0 B9 <br /> used to protect canal banks from erosion? <br /> Bed/Furroiv Management: <br /> 17) . Are water furrows properly shaped and grassed to prevent erosion, ❑ ❑ B101 A14 <br /> rutting, and other problems that may result in excess sediment <br /> transport off- site ? <br /> 18 ) . Is a narrow herbicide band maintained with a width appropriate ❑ ❑ B11 <br /> for the size of the trees? <br /> 19) . Are vegetated water furrows, drain tiles, and settling basins used 0 ❑ B10 - 14 <br /> to insure minimum movement of sediment to off- site water bodies ? <br /> Construction Activities: <br /> 20) . Are measures taken to prevent erosion (sediment loss) during ❑ ❑ B107 15 <br /> earth-working activities (i . e . , hay bales or ribbon turbidity barriers) ? <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.