My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-313L
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-313L
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 12:24:37 PM
Creation date
9/30/2015 7:07:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2003
Control Number
2003-313L
Agenda Item Number
11C.2
Entity Name
Cost Share Grant Contract
Subject
Jerre Luther, Belair Groves, Joint Venture,Gracewood Inc.
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3523
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> OPERATION AND MAINTENANCE PLAN <br /> STRUCTURE FOR WATER CONTROL <br /> COOPERATOR 3& 419 0JNr ,�ll2E DATE Al dEl4 ,846 2 260.3 <br /> sq <br /> ADDRESS • � A4 xd ✓E 3 2 q6;/ <br /> #2 f <br /> PRACTICE LOCATION - SEC Z � T 3 S R 35 ,E FIELD NO . ye3[( Af <br /> GENERAL <br /> A properly operated and maintained structure for water control is an asset to your farm. This <br /> structure was designed and installed to safely convey water at condition that will prevent erosion. <br /> The estimated life span of this system is at least S years. The life of this system can be <br /> assured and usually increased by developing and carrying out a good operation and maintenance <br /> program. <br /> This practice will require you to perform periodic operation and maintenance to maintain <br /> satisfactory performance. Here are some recommendations to help you develop a good operation <br /> and maintenance program. <br /> GENERAL RECOMMENDATIONS <br /> • All fences, railings, and/or warning signs shall be maintained to provide warning and/or <br /> prevent unauthorized human or livestock entry. <br /> • Maintain vigorous growth of desirable vegetative coverings. This includes reseeding, <br /> fertilization, and controlled application of herbicides when necessary . Periodic mowing may <br /> also be needed to control height. <br /> • Remove any debris that may accumulate on or in the immediate area of the structure. <br /> • Make sure that all structural drains are functional . <br /> • Determine and eliminate causes of settlement or cracks in the earthen sections and repair <br /> damage. <br /> • Repair spalls, cracks and weathered areas in concrete surfaces. <br /> • Repair or replace rusted or damaged metal and paint. <br /> • Check all valves, gates and other appurtenances for proper functioning. If worn or damaged, <br /> repair or replace following the manufacturer's recommendations. <br /> • Replase v . evdJR-.Lrd UL dislifit"d rock nprap o . C . z. . A/ . <br /> • Check all timber or lumber sections for decay and other damage, especially sections in <br /> contact with earth or other materials . Repair damaged sections and apply protective <br /> coatings as needed . <br />
The URL can be used to link to this page
Your browser does not support the video tag.