Laserfiche WebLink
1332.72 ft <br />347 <br />4th <br />St* <br />D-2 <br />General Specifications and Plan <br />1322.62 ft <br />ATSTM Effluent Distribution <br />575 ft and Harvest Boz <br />Algal Turf Scrubber <br />Lift Station #2 and z <br />Distribution Boz az <br />Primary Settling Pond <br />Station #1 <br />Direct Boring Influent <br />Line <br />1293.47 ft <br />ateral D Canal <br />ntake Structure <br />74th Ave <br />Compost <br />Area <br />Harvest by - <br />Pass and <br />recycle flume <br />Effluent Lines <br />Effluent <br />Polishing Pond <br />Created Wetland <br />E fflu dnt <br />Discharge <br />Literal C Canal <br />0 <br />284.04 ft <br />Proposed 10 MGD <br />Egret Marsh Stormwater Park <br />Indian River County, Florida <br />July, 2005 <br />Drawing not to scale <br />F1 <br />