Laserfiche WebLink
WORK AUTHORIZATION DIRECTIVE <br /> No. 2005_0I7 )Ooi� - OOJY DEC 14 2005 <br /> IRC — BLACK VILLA WATER MAIN EXTENSION ON 201" ' AVENUE AT 9" ' PLACE <br /> DATE OF ISSUANCE: December 20, 2005 EFFECTIVE DATE : December 20 , 2005 <br /> OWNER: Indian River County <br /> CONTRACTOR: The Danella Companies Inc <br /> CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 <br /> PROJECT : IRC — Block Villa Subdivision 6" Water Main Tie- In on 20°i Avenue at 9" Place <br /> COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR' S PROJECT NO . : N/A <br /> You are directed to proceed promptly with the following work: <br /> Description : <br /> Install about 60 L F of 6" FIDPE Directional Drill water pipe across 20°i Avenue at 91' Place and tie into <br /> existing 6" AC Pipe with Wct Tap Assembly with 6" GV&B ; install 6" GV&B on end . <br /> Puppose of Work Authorization Directive : <br /> The installation of (he 6" FIDPE water main will allow the Contractor for the Block Villas Water <br /> Assessment to complete his project <br /> Attachments : (List documents supporting work) <br /> Exhibit 1 Cost Estimate <br /> Method of determining Contract Price : <br /> Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County <br /> Commissioners on February 15 , 2005 to The Danella Companies . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract. Time is summarized below: <br /> Estimated Labor Cost = $4,259 . 35 Estimated Contract 14 days <br /> Time : <br /> ..'R, <br /> Total Estimated Labor Costs = $4 , 259 . 35 <br /> ;v f <br /> ACC TE REC M",D : APPROVI D <br /> By: By. B <br /> DANELLA ENGINEER C1 IR <br /> COMPANIES r <br /> Date : IL -/ 2 -0 _S� Date : �2 �� Date : 01 '=03s06•, t ; o '% . . <br /> Exhibit 2 <br /> CADOCUM G— I ANFIDUC - I ALOCA LS— I vremp`,notcs6030C 8t- 1934501 .doc <br />