My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-004
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:02:53 AM
Creation date
9/30/2015 8:07:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/03/2006
Control Number
2006-004
Agenda Item Number
7.S.
Entity Name
The Danella Companies, Inc.
Subject
Labor contract Work Auth. No. 2005-017, Installation of water main
Area
20th Avenue at 9th Place
Bid Number
7033
Supplemental fields
SmeadsoftID
4436
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br /> No. 2005_0I7 )Ooi� - OOJY DEC 14 2005 <br /> IRC — BLACK VILLA WATER MAIN EXTENSION ON 201" ' AVENUE AT 9" ' PLACE <br /> DATE OF ISSUANCE: December 20, 2005 EFFECTIVE DATE : December 20 , 2005 <br /> OWNER: Indian River County <br /> CONTRACTOR: The Danella Companies Inc <br /> CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 <br /> PROJECT : IRC — Block Villa Subdivision 6" Water Main Tie- In on 20°i Avenue at 9" Place <br /> COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR' S PROJECT NO . : N/A <br /> You are directed to proceed promptly with the following work: <br /> Description : <br /> Install about 60 L F of 6" FIDPE Directional Drill water pipe across 20°i Avenue at 91' Place and tie into <br /> existing 6" AC Pipe with Wct Tap Assembly with 6" GV&B ; install 6" GV&B on end . <br /> Puppose of Work Authorization Directive : <br /> The installation of (he 6" FIDPE water main will allow the Contractor for the Block Villas Water <br /> Assessment to complete his project <br /> Attachments : (List documents supporting work) <br /> Exhibit 1 Cost Estimate <br /> Method of determining Contract Price : <br /> Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County <br /> Commissioners on February 15 , 2005 to The Danella Companies . <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract. Time is summarized below: <br /> Estimated Labor Cost = $4,259 . 35 Estimated Contract 14 days <br /> Time : <br /> ..'R, <br /> Total Estimated Labor Costs = $4 , 259 . 35 <br /> ;v f <br /> ACC TE REC M",D : APPROVI D <br /> By: By. B <br /> DANELLA ENGINEER C1 IR <br /> COMPANIES r <br /> Date : IL -/ 2 -0 _S� Date : �2 �� Date : 01 '=03s06•, t ; o '% . . <br /> Exhibit 2 <br /> CADOCUM G— I ANFIDUC - I ALOCA LS— I vremp`,notcs6030C 8t- 1934501 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.