My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-004
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:02:53 AM
Creation date
9/30/2015 8:07:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/03/2006
Control Number
2006-004
Agenda Item Number
7.S.
Entity Name
The Danella Companies, Inc.
Subject
Labor contract Work Auth. No. 2005-017, Installation of water main
Area
20th Avenue at 9th Place
Bid Number
7033
Supplemental fields
SmeadsoftID
4436
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> y <br /> Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: IRC - Block Villa Subdivision 6" Water Main Tie-In on 20th Avenue at 9th Place by Directional Drill <br /> UCP #2624 <br /> 8-Dec-05 <br /> Bid Item Estimated Unit of i Unit Total Labor Material Uait material Total <br /> Item No. Description uantit Measure Price Price price Price Price <br /> 63 Mobilization 1 0.04 $ 160.73 <br /> 64 DemobilizationI <br /> 0.01 $40. 181 <br /> 65 Maintenance of Traffic I 0.01 $40. 18 <br /> 04b Install 6" HDPE Directional Drill Pie 60 LF 18 .00 $ 1 ,080.00 8 .90 $534 .00 <br /> Ole Install 6" PVC Water Main 20 LF 5.60 $ 112 .00 5,71 $ 114.20 <br /> 12a Install 6" X 6" SS Wel Tap Assembly w/ 6" GV&B I EA 500.00 $500.00 1 ,053 .99 $ 1 ,053 .99 <br /> 13b Tap 6" AC Main I EA 600.00 $600.00 <br /> 17c Install 6" NRS Gale Valve I EA 250.00 $250.00 477 ,70 $477.70 <br /> $0.00 <br /> 6 Fumish & Install DIP Fittings 0.25 TONS 1 ,665.00 $416.25 5,500.00 $ 1 ,375.00 <br /> $0.00 <br /> 23 Potholes 2 EA 200.00 $400.00 <br /> $0.00 <br /> 53 ROW Gradin 100 SY 1 .00 $ 100.00 <br /> 56A Saw Cut, Remove and Dispose of Asphalt 2 Ton <br /> 25.00 $50.00 <br /> 60 Limerock Base Replacement over Trench 10 SY 19.00 $ 190.00 <br /> 10. 53 1 $ 105 .30 <br /> 56c Install Asphaltic Cement 2 Ton00 <br /> 00 <br /> 160.00 $320.00 47.00 $9q, .3 <br /> Subtotal Water Facilities Labor $4,018 .25 <br /> Total Water Facilities Labor $4,259.35 <br /> Total Materials <br /> Total Labor and Materials Cost Estimate $8,013 .54 $3 ,754. 19 <br /> TOTAL ESTIMATED COST $8,013.54 <br /> Exhibit 1 <br /> Cmhacta's Bid Item List <br />
The URL can be used to link to this page
Your browser does not support the video tag.