Laserfiche WebLink
A <br /> y <br /> Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: IRC - Block Villa Subdivision 6" Water Main Tie-In on 20th Avenue at 9th Place by Directional Drill <br /> UCP #2624 <br /> 8-Dec-05 <br /> Bid Item Estimated Unit of i Unit Total Labor Material Uait material Total <br /> Item No. Description uantit Measure Price Price price Price Price <br /> 63 Mobilization 1 0.04 $ 160.73 <br /> 64 DemobilizationI <br /> 0.01 $40. 181 <br /> 65 Maintenance of Traffic I 0.01 $40. 18 <br /> 04b Install 6" HDPE Directional Drill Pie 60 LF 18 .00 $ 1 ,080.00 8 .90 $534 .00 <br /> Ole Install 6" PVC Water Main 20 LF 5.60 $ 112 .00 5,71 $ 114.20 <br /> 12a Install 6" X 6" SS Wel Tap Assembly w/ 6" GV&B I EA 500.00 $500.00 1 ,053 .99 $ 1 ,053 .99 <br /> 13b Tap 6" AC Main I EA 600.00 $600.00 <br /> 17c Install 6" NRS Gale Valve I EA 250.00 $250.00 477 ,70 $477.70 <br /> $0.00 <br /> 6 Fumish & Install DIP Fittings 0.25 TONS 1 ,665.00 $416.25 5,500.00 $ 1 ,375.00 <br /> $0.00 <br /> 23 Potholes 2 EA 200.00 $400.00 <br /> $0.00 <br /> 53 ROW Gradin 100 SY 1 .00 $ 100.00 <br /> 56A Saw Cut, Remove and Dispose of Asphalt 2 Ton <br /> 25.00 $50.00 <br /> 60 Limerock Base Replacement over Trench 10 SY 19.00 $ 190.00 <br /> 10. 53 1 $ 105 .30 <br /> 56c Install Asphaltic Cement 2 Ton00 <br /> 00 <br /> 160.00 $320.00 47.00 $9q, .3 <br /> Subtotal Water Facilities Labor $4,018 .25 <br /> Total Water Facilities Labor $4,259.35 <br /> Total Materials <br /> Total Labor and Materials Cost Estimate $8,013 .54 $3 ,754. 19 <br /> TOTAL ESTIMATED COST $8,013.54 <br /> Exhibit 1 <br /> Cmhacta's Bid Item List <br />