Laserfiche WebLink
_ _ _ _ _ Indian River County Department of Utilities <br /> COST ESTIMATE and CON I RACTOR'S BID ITEM LIST. _ <br /> Pro'ec) ••.1)S t n ReBMions - CanNcta with FDOT Drainage and Pavement Im raeemenh Wpbana m Sebastian <br /> Dewrlpbon• IIIC.Pg2]8], WIPM 47133516044699-06536 - - -� ---- ' <br /> i I <br /> 19-Ma -a6 � LABOR COSTS , <br /> BidI Bid Item slime Umt of Labor Uai Total Labor <br /> Item Na Descri hon wnfi Measure Price Price addditinna deducfioas <br /> __. _ <br /> 77 Mobilization t 4% 1 $31936,96 $3,936.96 additional mobilization due to increases <br /> 78 Demobilization I 1% 5984.24 in contract <br /> 79 Maintenance of Traffic l I % $984,24 ' <br /> 798+73.50 RELOCATE FIRE HYDRANT TO ROW -- - - ' - _-`- --- <br /> 20a Relocate Fire Hydrant Assembly 1 EA $415,00 S415,00 <br /> Ole Install 6" PVC Water Main 30 LF $560 $168.00 <br /> 17c Install 6" NRS GV&B 1 EA $395.00 $395.00 - <br /> 07a Install Mechanical Restrained Joints on Existing Main I EA $33300 $333,00 <br /> O6 Install Mechanical Restrained Joint Fittings 0. 10 TON $1 665 00 $166.50 _ -- - <br /> 5 ea $200.00 $1,00000 5 potholes - <br /> 803+60.00 RELOCATE 14" FM ' <br /> 09 Make Connection to Existing Main 2.0 FA $795.00 $1 ,590.00 -$12500.0 <br /> 04h Install 24'• HDPE Horizontal Directional Dill 60.0 LF $ 156,001 $9,36000 -$9,360.00 <br /> 06 Install Mechanical Restrained Joint Fittings 0.40 TON $1,665.00 $666.00 -5666.00 <br /> 808+00 RELOCATE FIRE HYDRANT TO ROW - <br /> 20a Relocate Fire Hydrant Assembly I EA 5415.00 $415.00 <br /> Ole Install hralall 6" PVC Water Main 30 LF $5.60 $168.00 <br /> 17c install 6" NRS GV&B 1 EA $395.00 $395.00 <br /> 07a Install Mechanical Restrained Joints on Existing Main 1 EA - -$3-3300 $333.00 <br /> 06 Install Mechanical Restrained Joint Fittings 0. 10 TON $1 ,665.00 $166.50 - - <br /> 813+60,00 RELOCAVE FIRE HYDRANT TO ROW $1 ,000.00 5 potholes _ <br /> 20a Relocate Fire Hydrant Assicudily 1 EA S415.001 $415.00 _ - - <br /> Ole Install 6" PVC Water Main 30 LF $5.60 $168.00 <br /> I7c Install 6" NRS GV&B 1 EA $395.00 $39500 <br /> 07a Install Mechanical Restrained Joints on Existing Main 1 EA $33100 5333.00 <br /> 06 Install Mechanical Restrained Joint Fittings 0,10 TON $166500 $166.50 <br /> $1,000.00 5 potholes <br /> $17+80.00 RELOCATE FIRE HYDRANT TO ROW - - <br /> 20a Relocate Fire Hydrant Assembly I EA $415.00 $415.00 -- _--� - <br /> Ole Install 6" PVC Water Main 30 LF $5.60 $168,00 <br /> I7c Install 6" NRS GV&B 1 EA $395.00 $395.00 <br /> 07a Install Mechanical Restrained Joints on Existing Main 1 EA $333.00 $333.00 <br /> 06 Install Mechanical Restrained Joint Fittings 0. 10 TON $1,665.001 5166.50 - - <br /> 824+90,00 RELOCATE FIRE HYDRANT TO ROW $1,000.00 5 tholes <br /> 20a Relocate Fire Ilydrard Asscrattly 1 EA $415.00 5415.00 $ 12000,00 <br /> 5 potholes <br /> Ole Install 6" PVC Water Main 30 LF $560 $168.00 <br /> I7c Install 6" NRS GV&B 1 EA $395.00 $395.00 - <br /> 07a Install Mechanical Restrained Joints on Existing Main I EA $333.00 $333.00 _ <br /> 06 Install Mechanical Restrained Joint Finin s 0. 10 TON $1,665.00 $166.50 _ <br /> - -- - 833+18.00 RELOCATE FIRC HYDRANTTO ROW20a - - - _ - <br /> Ole Relocate FirePV Hydrant Main 1 LF $4$5.60Ole Install Install 6" PVC Water Main 30 LF 55.60 $16800 <br /> 17c Install 6" MRS GV&B I EA $395,00 $39500 <br /> 07a Install Mechanical Restrained Joints on Existing Main I EA $333 00 $333.00 <br /> 06 1 Install Mechanical Restrained Joint Fittings 0.10 TON $1,665.00 $ 166.50 <br /> $ 100000 5 tholes <br /> 837+40.00 RELOCATE 16" WM <br /> 09 Make Connection to Existing Main 2.0 EA $795.00 $1 ,590.00 41 ,590 001_- <br /> 04f Install 16" HDPE Horizontal Directional Dell 60.0 LF 557.00 $3,420.00 -$3,420001 <br /> 06 <br /> Install Restrained Joint Fittings 0, 10 TON 51 ,66500 $166.50 -$ 16600 <br /> Attachment 3 ___ - <br /> -- - - - - <br /> - r' <br />