My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-058
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:41:17 PM
Creation date
9/30/2015 10:35:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/13/2007
Control Number
2007-058
Agenda Item Number
7.T.
Entity Name
The Danella Companies
Subject
Change Order No.1 US 1 Reflections-Conflicts with FDOT
Drainage and Pavement Improvements
Project Number
472-169000-06507
Supplemental fields
SmeadsoftID
6129
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> COST ESTIMATE and COIV'1'RAC70R'S BID ITEM LLSU 1 _ I �_ - � — <br /> Description: yICCPft17780 WIPN47123536-044699416536 -- 1d60R COSTS -- <br /> ProieclfUSlatRenectos Congress with FOOT Drainage and Pavement Improvement Wabaaso to Sebastian _ <br /> Bid Bid Item <br /> — - _ :sdmate Unit of Labor Uni Total Labor <br /> Item No. <br /> Descri tion - — "— - - - <br /> uaRti Mensurc Price Price addditions deduettoru <br /> 20 -- <br /> _ 991+811.00 RELOCATE FIRE HVDRANT 'I'O ROW <br /> a _ Relocate Fire H dram Assembly _ I LA 5415 00 5415.00 — --- ' - r -- --- <br /> Ule Install 6" PVC Water Main 30 LF 55.60 $168.00 --- -- _— _ --- <br /> _ 17c Install G' NRS O V&H I EA $395 W $395.00 - �- <br /> 07a -- Install Mechanical Restrained Joints on Rxisting Mein 1 FA 5333.06 $33300 — - <br /> 06 Install Mechanical Restrained Joint Fittings 0. 10 TON $1 ,665.00 $ 166.50 $1,000.00 - ' <br /> x6 <br /> wet to <br /> 51,000.00 52 16ofioles 1 <br /> 45 hrslall Asphalt Cement Replacement over Full Trench 200 SY $20.00 $4,000.00 - " — - - '--- T �-- - <br /> $4,000 00 <br /> 46 Remove, Dis se of and Re lace Rock Base 200 SY $10.00 $2,000.00 42,1000 <br /> 47 _ Remove, Dispose of and relate Stab. Sobgmde 200 SY $6.00 $ 1 ,200.00 -$ 12W 00 - <br /> 60b Sod and topsail 100 SY $6.00 5600.0000 — <br /> Subtotal Sublolal Labor $98424,00 5N3,50880 -$4783900 --- <br /> Subtotal Subtotal Labor, Mob., Demob., MOT, MatenaLs, & $104,329.44 _ <br /> Force event. IRCDUS Contingency Account 1 lowane 10% $10432.44 - - - - -- "'-- - <br /> -- abor Cost S114,762.38 net than <br /> SuhTOMI <br /> TOTAL PROJECT COST —- --- <br /> -- --- - 5150,432. 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.