Laserfiche WebLink
Item #16: CEDAR FASCIA : On Sheets A-5 and A-6 Building Elevations delete the reference to <br /> "T&G" . The fascia shall be 2 X 10 Finger Joint Cedar with all faces primer sealed <br /> prior to installation . Section A/A- 10 is correct, and in addition , provide two rows of <br /> P .T. 2 X 4 secured to the steel end frame with approved tech fasteners prior to <br /> installing the 2 X 10 fascia. The 2 X 4 ' s are shown on the section , but were not called <br /> out. <br /> Item # 17 : IRRIGATION SYSTEM : All irrigation components to be manufactured by Rain- <br /> Bird. <br /> Item # 18 : IRRIGATION SYSTEM: All references to 2V4 inch schedule 40 pipe should <br /> reference 2 inch schedule 40 pipe. <br /> Item #19: IRRIGATION SYSTEM : Additional irrigation heads will be required to provide <br /> 100% head to head coverage . <br /> Item #20: IRRIGATION SYSTEM : Pop- up sprinklers are to be installed around the <br /> Administration Building in areas noted for future ground cover. <br /> Item #21 : IRRIGATION SYSTEM : An additional wire will be required for the parking islands <br /> in front of the Administration Building. <br /> Item #22 : IRRIGATION SYSTEM : The design pump pressure for the project will be <br /> determined by the Contractor to insure properly functioning irrigation system. <br /> Item #23 : IRRIGATION SYSTEM : Connections shall be made between the 2 inch submain <br /> and the 3 inch main line. <br /> Item #24: IRRIGATION SYSTEM (Clarification) : All sprinklers to spray away from buildings. <br /> Item #25 : PLAN SHEET ABB : Delete Revision 1 Note regarding endangered/threatened <br /> species . No inspections for, or relocation of, threatened/endangered species should be <br /> included in the bid prices. <br /> Item #26 : CLARIFICATION : The two bollards at the rear of the trash enclosure are to protect <br /> the masonry wall from the possible impact of the dumpster when the truck delivers <br /> and pushes it into the enclosure. The chain-link fence gates at the trash enclosure are <br /> to be attached directly to the reinforced masonry columns at the front corners of the <br /> enclosure . <br /> Page 3 <br /> F:\enginecring\Capital Projects\0701 IRC PARKS COM PL EVAddendums•.IRC Parks Maintenance Complex Addendum 04.doe <br />