My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #16: CEDAR FASCIA : On Sheets A-5 and A-6 Building Elevations delete the reference to <br /> "T&G" . The fascia shall be 2 X 10 Finger Joint Cedar with all faces primer sealed <br /> prior to installation . Section A/A- 10 is correct, and in addition , provide two rows of <br /> P .T. 2 X 4 secured to the steel end frame with approved tech fasteners prior to <br /> installing the 2 X 10 fascia. The 2 X 4 ' s are shown on the section , but were not called <br /> out. <br /> Item # 17 : IRRIGATION SYSTEM : All irrigation components to be manufactured by Rain- <br /> Bird. <br /> Item # 18 : IRRIGATION SYSTEM: All references to 2V4 inch schedule 40 pipe should <br /> reference 2 inch schedule 40 pipe. <br /> Item #19: IRRIGATION SYSTEM : Additional irrigation heads will be required to provide <br /> 100% head to head coverage . <br /> Item #20: IRRIGATION SYSTEM : Pop- up sprinklers are to be installed around the <br /> Administration Building in areas noted for future ground cover. <br /> Item #21 : IRRIGATION SYSTEM : An additional wire will be required for the parking islands <br /> in front of the Administration Building. <br /> Item #22 : IRRIGATION SYSTEM : The design pump pressure for the project will be <br /> determined by the Contractor to insure properly functioning irrigation system. <br /> Item #23 : IRRIGATION SYSTEM : Connections shall be made between the 2 inch submain <br /> and the 3 inch main line. <br /> Item #24: IRRIGATION SYSTEM (Clarification) : All sprinklers to spray away from buildings. <br /> Item #25 : PLAN SHEET ABB : Delete Revision 1 Note regarding endangered/threatened <br /> species . No inspections for, or relocation of, threatened/endangered species should be <br /> included in the bid prices. <br /> Item #26 : CLARIFICATION : The two bollards at the rear of the trash enclosure are to protect <br /> the masonry wall from the possible impact of the dumpster when the truck delivers <br /> and pushes it into the enclosure. The chain-link fence gates at the trash enclosure are <br /> to be attached directly to the reinforced masonry columns at the front corners of the <br /> enclosure . <br /> Page 3 <br /> F:\enginecring\Capital Projects\0701 IRC PARKS COM PL EVAddendums•.IRC Parks Maintenance Complex Addendum 04.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.