Laserfiche WebLink
Item #I : FIRE ALARM SYSTEM : Bidders should consult with their Fire Alarm supplier for <br /> their views on the electrician ' s scope of work. The intent of the bid documents is that <br /> precise plans for the fire alarm system are to be prepared by the licensed fire alarm <br /> supplier and installer in accordance with the written performance specifications. <br /> Item #2 : REVISED PLANSHEETS : The following plans have been modified and are attached. <br /> Sheet E-2, rev. #5 , 27 May 09 ; Sheet E- 6, rev. #4, 27 May 09 ; Sheet E-7, rev. #3 , 27 <br /> May 09 ; Sheet U- 1 , Rev. # 1 , 26 May 09 ; Sheet U-4, Rev. # 126, May 09. <br /> Item #3 : PHONE AND DATA CLARIFICATION: The following items apply to the phone <br /> and data symbols depicted on the plans; 1 ) Each location symbolized as a <br /> "Communications Information Outlet" shall be equipped with one RJI I telephone <br /> socket and one 8P8C WE/SS CAT 6 Ethernet Socket, with a suitable 2 port cover. <br /> Ethernet sockets shall be blue. RJ1 I sockets shall be white or gray or tan. Covers <br /> shall match power outlet covers in color. <br /> 2) Wiring to each RJ1 I telephone socket shall be two twisted pairs. 3) Wiring to each <br /> Ethernet socket shall be 8 conductor CAT 6 cable. 4) From each outlet a minimum of <br /> fifteen feet of excess cable tail from the conduit opening in the Electric/Phone room <br /> shall be left coiled in the Electric/Phone room, with the excess CAT 6 cable to be <br /> brought to the northerly half of the TTB and the telephone twisted pairs to the <br /> southerly half. Specifications Appendix C Section 16750-Voice and Data <br /> Communication Cabling 8 Sheets added. <br /> Item #4 : REVISED ITEMIZED BID SCHEDULE : The enclosed Itemized Bid Schedule dated <br /> May 29, 2009 should be used for The Contractor' s Bid in lieu of the Itemized Bid <br /> Schedule in the original Contract Documents. Please note the change in item #62 "2 <br /> inch PVC Sleeve". <br /> Item #5 : ASPHALT PAVING: Delete all plan references to SP9 . 5 asphalt on the plans . All <br /> asphalt paving will be SP12 . 5 installed in one ( 1 ) 2 inch lift. <br /> Item #6 : TRANSFORMER PAD LOCATION : The transformer pad has been specified on the <br /> attached Sheet E-2 , rev. #5 , 27 May 2009. See also Addendum #2, item #32 which <br /> remains , except note this new transformer location. <br /> Item #7 : SECURITY/ALARM PANEL : On the attached Sheet E-2, rev #5 , 27 May 2009, a <br /> duplex outlet is now depicted for the Security/Alarm Panel in the Electric/Phone <br /> Room. <br /> Item #8 : SPECIFICATION SECTION 16750 : A revised specification section has been issued <br /> as part of this addendum. Category 6 cable shall be provided and installed by the <br /> contractor. Disregard (delete) Addendum #2, Item #46. <br /> F:\Engineering\Capital Projects\0701 IRC PARKS COMPLEX\Addendums\[RC Parks Maintenance Complex Addendum #5.doc <br />