Laserfiche WebLink
SECTION 16750 - VOICE AND DATA COMMUNICATION CABLING <br /> PARTI - GENERAL <br /> 1 . 1 SUMMARY <br /> A. This Section includes wire, cable, connecting devices, installation, and testing for wiring <br /> systems to be used as signal pathways for voice and high-speed data transmission. The <br /> Contractor is to provided and install the components listed in this specification and shown on <br /> the plans, which include, but are not limited to the phone/data room backboard unistrut and <br /> patch panel, cable terminations on the patch panel cable hangers and conduit from the patch <br /> panel to each wall outlet, and the wall outlets. The Contractor shall provide services to test all <br /> components from the patch panel to and including each outlet port and shall provide the Owner <br /> with written test results per TIA-56813 . <br /> 1 .2 SUBMITTALS <br /> A . Product Data: For each product indicated. <br /> B . Shop Drawings : Include dimensioned plan and elevation views of each individual component. <br /> Show equipment assemblies, method of field assembly, workspace requirements, and access <br /> for cable connections . <br /> 1 . System labeling schedules, including electronic copy of labeling schedules, as specified <br /> in Part 3 , in software and format selected by Owner. <br /> 2 . Wiring diagrams . Show typical wiring schematics including the following: <br /> a. Workstation outlets, jacks, and jack assemblies. <br /> b. Patch cords. <br /> C. Patch panels. <br /> C. Cable Administration Drawings : As specified in Part 3 . <br /> D. Field quality-control test reports. <br /> E. Operation and maintenance data. <br /> 1 .3 QUALITY ASSURANCE <br /> A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, <br /> Article 100, and TIA-568B by a testing agency acceptable to authorities having jurisdiction, <br /> and marked for intended use. <br /> B . Comply with NFPA 70 and TIA-568B . <br /> C. <br /> 5/29/09 1675 VOICE AND DATA COMMUNICATION CABLING Page 1 of 8 <br /> F:\Engineering\Capital Projects\0701 IRC PARKS COMPLEX\Addendums\IRC Parks Maintenance Complex Addendum #5.doc <br />