My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Install exposed cables parallel and perpendicular to surfaces or exposed structural members and <br /> follow surface contours where possible. <br /> H. Secure and support cables at intervals not exceeding 30 48 inches (760 mm) and not more than <br /> 6 inches ( 150 mm) from cabinets, boxes, fittings, outlets, racks, frames, and terminals. <br /> I . Wiring within Wiring Closets and Enclosures : Provide conductors of adequate length . Train <br /> conductors to terminal points with rotes with adequate slack for the Chatsworth rack. Use <br /> lacing bars to restrain cables, to prevent straining connections, and to prevent bending cables to <br /> smaller radii than minimums recommended by manufacturer. <br /> J. Separation of Wires : Comply with TIA/EIA-569-AB rules for separating unshielded copper <br /> voice and data communication cabling from potential EMI sources, including electrical power <br /> lines and equipment. <br /> K. Make splices, taps, and terminations only at indicated outlets, terminals, and cross-connect and <br /> patch panels using T568A methods. <br /> L. Use splice and tap connectors compatible with media types . <br /> 3 .3 GROUNDING <br /> A. Comply with Division 16 Section " Grounding and Bonding. " <br /> B . Ground cable shields, drain conductors, and equipment to eliminate shock hazard and to <br /> minimize ground loops, common-mode returns, noise pickup, cross talk, and other <br /> impairments. <br /> C. Bond shields and drain conductors to ground at only one point in each circuit. <br /> D . Signal Ground Terminal : Locate in each equipment room and wiring closet; isolate from <br /> power system and equipment grounding. <br /> E. Signal Ground Bus : Mount on wall of main equipment room with standoff insulators. <br /> F. Signal Ground Backbone Cable: Extend from signal ground bus to signal ground terminal in <br /> each equipment room and wiring closet. <br /> 3 .4 INSTALLATION IN EQUIPMENT ROOMS AND WIRING CLOSETS <br /> A. Install plywood backboards on walls of equipment rooms and wiring closets from floor to <br /> ceiling. <br /> B. Mount patch panels, terminal strips, and other connecting hardware on backboards, unless <br /> otherwise indicated. <br /> 5/29/09 16750 VOICE AND DATA COMMUNICATION CABLING Page 6 of 8 <br /> F:\Engineering\Capital Projects\0701 IRC PARKS COMPLEX\Addendums\IRC Parks Maintenance Complex Addendum #5.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.