Plan Revisions : <br /> Item #1 : Overhead Sectional Doors: All overhead section doors shall be galvanized steel, delivered with <br /> a manufacturer' s finished paint on the interior and exterior faces. Size of doors are standard <br /> throughout at 12 ' -0" wide x 10 '-0" high. Disregard wall sections A/A-2, A/A-3 , and B/A10 <br /> that depict 12 ' high doors, and the building elevations that depict 12 ' high doors. On door <br /> schedules, Sheet A-4, disregard all powder coating requirements. <br /> Item #2 : Specification section 08360: Sectional Overhead Doors — See revised Specifications Section <br /> 08362 : Sectional Overhead Doors- Galvanized Steel. Entire section is attached. <br /> Item #3 : Sheet A-4 Door Schedules : Disregard all reference to powder coating of doors # 1 , 2, 3 at <br /> Maintenance Building and doors # 1 thru 9 at Storage Bay Building. Provide 2 coats roller <br /> applied paint per specification division 09900 ( 1 . 13)(c), over one coat of a field applied primer <br /> per same specification division, on doors and frames . <br /> Item #4 : Refrigerator at Administration Building: Delete this appliance. It will be supplied and installed <br /> by Owner. Contractor to provide power and ice maker line per plans . Note : Base cabinet <br /> rough opening to wall may have to be enlarged. Bid cabinet uppers and lowers as drawn. <br /> Architect will revise cabinet elevation A- 1 (D) during shop drawing submittal phase. <br /> Item #5 : Ceiling Insulation (Note for Clarification) : Make special reference to sheet A- 10. The <br /> Administration Building has a specific assembly detailed per section A/A- 10. The other two <br /> buildings utilize vinyl faced fiberglass batt insulation. <br /> Item #6 : Windows (Note for Clarification) : The Administration Building exterior windows are a <br /> combination of impact glazing (at entry sidelites per schedule on sheet A-4) and non-impact <br /> with operable impact rated shutters (per elevations and schedule on Sheet A-4). On window <br /> schedule conference room window #4, change frame manufacturer to Arch or Kawneer. Refer <br /> to detail 11 /A- 11 for frame color and glazing options . <br /> Item #7 : Door Glass (Doors 6, 23 & 24) : Provide rated wire glass in lieu of firelite in these three (3) <br /> doors, as permitted by FBC 2004, Table 715 .4.3 . <br /> Item #8 : Generator Pad: The generator pad will be located per civil sheet C-2, within the secured <br /> compound fencing. Disregard pad location on sheets F- 1 and S-3 . Place generator on concrete <br /> pad so radiator discharge drafts to the west. Pad shall be 10 'x18 ' , 3 ,000 psi concrete, 9 1 /4" <br /> thick, reinforced with #4 bars at 18" o/c each direction. See also Generator Pad Detail on Sheet <br /> E-6 for subgrade preparation and mounting requirements. <br /> Item #9 : Clarification on Details : Detail 4/A-3 is cut on sheet A-3 at the Storage Bay electrical room. <br /> Detail 1 /A-3 is cut on sheet A-3 at the typical separation walls in the Storage Bay Building. <br /> - 2 — <br /> F. Engineeringl Capital Projects10701 IRC PARKS COMPLEXIAddendumsllRC Parks Maintenance Complex Addendum #2.doc <br />