My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Revisions : <br /> Item #1 : Overhead Sectional Doors: All overhead section doors shall be galvanized steel, delivered with <br /> a manufacturer' s finished paint on the interior and exterior faces. Size of doors are standard <br /> throughout at 12 ' -0" wide x 10 '-0" high. Disregard wall sections A/A-2, A/A-3 , and B/A10 <br /> that depict 12 ' high doors, and the building elevations that depict 12 ' high doors. On door <br /> schedules, Sheet A-4, disregard all powder coating requirements. <br /> Item #2 : Specification section 08360: Sectional Overhead Doors — See revised Specifications Section <br /> 08362 : Sectional Overhead Doors- Galvanized Steel. Entire section is attached. <br /> Item #3 : Sheet A-4 Door Schedules : Disregard all reference to powder coating of doors # 1 , 2, 3 at <br /> Maintenance Building and doors # 1 thru 9 at Storage Bay Building. Provide 2 coats roller <br /> applied paint per specification division 09900 ( 1 . 13)(c), over one coat of a field applied primer <br /> per same specification division, on doors and frames . <br /> Item #4 : Refrigerator at Administration Building: Delete this appliance. It will be supplied and installed <br /> by Owner. Contractor to provide power and ice maker line per plans . Note : Base cabinet <br /> rough opening to wall may have to be enlarged. Bid cabinet uppers and lowers as drawn. <br /> Architect will revise cabinet elevation A- 1 (D) during shop drawing submittal phase. <br /> Item #5 : Ceiling Insulation (Note for Clarification) : Make special reference to sheet A- 10. The <br /> Administration Building has a specific assembly detailed per section A/A- 10. The other two <br /> buildings utilize vinyl faced fiberglass batt insulation. <br /> Item #6 : Windows (Note for Clarification) : The Administration Building exterior windows are a <br /> combination of impact glazing (at entry sidelites per schedule on sheet A-4) and non-impact <br /> with operable impact rated shutters (per elevations and schedule on Sheet A-4). On window <br /> schedule conference room window #4, change frame manufacturer to Arch or Kawneer. Refer <br /> to detail 11 /A- 11 for frame color and glazing options . <br /> Item #7 : Door Glass (Doors 6, 23 & 24) : Provide rated wire glass in lieu of firelite in these three (3) <br /> doors, as permitted by FBC 2004, Table 715 .4.3 . <br /> Item #8 : Generator Pad: The generator pad will be located per civil sheet C-2, within the secured <br /> compound fencing. Disregard pad location on sheets F- 1 and S-3 . Place generator on concrete <br /> pad so radiator discharge drafts to the west. Pad shall be 10 'x18 ' , 3 ,000 psi concrete, 9 1 /4" <br /> thick, reinforced with #4 bars at 18" o/c each direction. See also Generator Pad Detail on Sheet <br /> E-6 for subgrade preparation and mounting requirements. <br /> Item #9 : Clarification on Details : Detail 4/A-3 is cut on sheet A-3 at the Storage Bay electrical room. <br /> Detail 1 /A-3 is cut on sheet A-3 at the typical separation walls in the Storage Bay Building. <br /> - 2 — <br /> F. Engineeringl Capital Projects10701 IRC PARKS COMPLEXIAddendumsllRC Parks Maintenance Complex Addendum #2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.