My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 09655 - VINYL TRANSITION MOLDING <br /> PART1 - GENERAL <br /> 1 .01 RELATED DOCUMENTS: <br /> The bidding and Contract Documents, General Requirements and Addenda as may be <br /> issued prior to bidding, shall govern the work under this section. <br /> 1 .02 DESCRIPTION: <br /> Provide vinyl transition strips wherever carpet abuts vinyl flooring systems, ceramic, <br /> quarry or porcelain flooring systems. Refer to the Interiors or Floor Plan Drawings to <br /> determine the actual model numbers specified and locations. <br /> 1 .03 QUALITY ASSURANCE: <br /> Acceptable Manufacturer: Select product of the following manufacturer or approved <br /> equals: <br /> TARKETT <br /> JOHNSONITE <br /> MERCER PRODUCTS COMPANY, INC. <br /> MACKLANBURG-DUNCAN <br /> FLEXCO COMPANY <br /> GENOTEK <br /> 1.04 SUBMITTALS : <br /> A. Literature: Submit manufacturers specifications and installation instructions for <br /> each type of material specified. <br /> B. Samples: Submit samples of all materials specified in this Section for approval and <br /> color selection. <br /> C. Maintenance Data: Furnish list of recommended maintenance methods and <br /> procedures. <br /> 1.05 PRODUCT HANDLING: <br /> Deliver and store on the site in original containers with seals unbroken and labels intact <br /> until time of use. <br /> 1.06 ENVIRONMENTAL REQUIREMENTS : <br /> Temperature of the rooms shall be 70 F. (21 C.) minimum for 24 hours prior to installation, <br /> during installation, and for 48 hours after installation. <br /> 09655-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.