My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> SECTION 08362 - SECTIONAL OVERHEAD DOORS - GALVANIZED STEEL <br /> PART 1 - GENERAL <br /> 1.01 QUALITY ASSURANCE <br /> A. Qualifications of Manufacturer: Products used in the work of this section shall be <br /> produced by a manufacturer regularly engaged in the fabrication of similar products <br /> and with a history of successful production acceptable to the Architect, such as <br /> those manufacturers listed below. <br /> B. All doors specified under this Section shall be guaranteed against defective <br /> materials, workmanship, and paint coatings for a period of 1 year following <br /> occupancy certificate. <br /> C. Installer: Installation of sectional doors shall be performed by the authorized <br /> representative of the manufacturer. <br /> D. Single-Source Responsibility: Provide doors, tracks, motors, and accessories from <br /> one manufacturer for each type of door. Provide secondary components from source <br /> acceptable to manufacturer of primary components. <br /> 1.02 DESCRIPTION OF WORK <br /> A. Work included: Provide and install all upward-acting sectional doors as scheduled <br /> and detailed in the construction documents and as specified herein. Related work: <br /> Preparation of opening, primed steel jambs, structural backing, miscellaneous iron <br /> work, electrical wiring, and glazing (if scheduled on the plans) are in the scope <br /> of work of other divisions or trades. <br /> 1.03 SUBMITTALS <br /> A. Product Data: Submit manufacturer's product data and installation instructions for <br /> each type of sectional door. Include both published data and specific data prepared <br /> for this project. <br /> B. Shop Drawings: Submit shop drawings for approval prior to fabrication. Include <br /> detailed plans, elevations, details of framing members, required clearances, anchors <br /> and accessories . Include relationship with adjacent materials. <br /> 1.04 DELIVERY, STORAGE AND HANDLING <br /> A. Deliver materials and products in labeled protective packages. Store and handle in <br /> strict compliance with manufacturer' s instructions and recommendations. Protect <br /> from damage from weather, excessive temperatures and construction operations. <br /> PART 2 - PRODUCTS <br /> 2.01 ACCEPTABLE MANUFACTURERS <br /> A. Doors shall be Galvanized Steel Sectional Overhead type as <br /> manufactured by one of the following companies: <br /> 1 . Clopay Building Products Company. <br /> 08362-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.