My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 2.07 TRACK <br /> A. Galvanized steel track shall as recommended by manufacturer to suit loading <br /> requirements and clearance requirements. Steel brackets or continuous steel angles <br /> shall be used for installing tracks on P.T. wood jambs. Vertical track shall be <br /> inclined through the use of adjustable brackets to assure weathertight closure at <br /> jambs. Horizontal track shall be reinforced with factory-applied galvanized angles <br /> as required. <br /> 2.08 HARDWARE <br /> A. All roller brackets and hinges shall be heavy-duty commercial grade <br /> galvanized steel. All rollers shall have ball bearings with case-hardened steel races. <br /> Lock shall be end stile interior mounted slide lock for inside security locking. <br /> 2.09 WIND-LOAD <br /> A. Doors shall be manufactured to withstand (-55# per square foot for 140 mph wind <br /> speed) or (-37 psf for 135 mph wind speed). In addition, sectional doors shall <br /> comply with the Florida Building Code for locations within the Wind Borne Debris <br /> Region for impact resistant coverings. <br /> 2. 10 ELECTRIC MOTOR OPERATION <br /> A. Provide UL listed electric operator, size and type as recommended by manufacturer <br /> to move door in either direction at not less than 2/3 foot nor mor than I foot per <br /> second. <br /> B. Provide Entrapment Protection with Photoelectric Sensors. <br /> C. Provide push button controls with open, close, and stop buttons for surface <br /> mounting on interior location adjacent to people entry door latch side. <br /> PART 3 - EXECUTION <br /> 3.01 PREPARATION <br /> A. Take field dimensions and examine conditions of substrates, supports, and other <br /> conditions under which this work is to be performed. Do not proceed with work <br /> until unsatisfactory conditions are corrected. <br /> 3.02 INSTALLATION <br /> A. Installation of the sectional overhead doors shall be by the manufacturer' s qualified <br /> and authorized distributor. Strictly comply with manufacturer's installation <br /> instructions and recommendations. Coordinate installation with adjacent work to <br /> ensure proper clearances and allow for periodic maintenance. Instruct Owner' s <br /> personnel in proper operating procedures and maintenance schedule. <br /> B. Door sections shall be level in the horizontal plane in the open and closed position <br /> to within a ''/1" tolerance maximum. Doors shall be free from binding or distortion. <br /> 3.03 ADJUSTING AND CLEANING <br /> A. Test sectional doors for proper operation and adjust as necessary to provide proper <br /> operation without binding or distortion. <br /> 08362-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.