Laserfiche WebLink
Plan Revisions : <br /> Item #1 : PROJECTION SCREEN- Delete the DA-LITE Auto Up/Down projection screen called out <br /> on Sheet A- 1 in Meeting Room 43 . All wiring and conduit to remain as shown. Contract <br /> Ft. Pierce Engineers Inc. with questions . Delete specification Section 11132-Projection <br /> Screens. <br /> Item #2 : DISABLED PARKING STRIPING- Delete the Disabled Parking Stall striping plan on <br /> Sheet ACC. Utilize the striping details depicted on the Civil Plans . <br /> Item #3 : NOTE FOR CLARIFICATION- Sheet E-2; The security/alarm panel shown in the <br /> Elec./Phone Room will be provided by the Owner. The General Contractor shall provide the <br /> 110 volt duplex outlet at the appropriate height. The Owner' s alarm company will supply <br /> and install the system during the construction of the project and during normal work hours <br /> of the General Contractor. Contact Chris Kafer at (772) 226- 1221 with questions. <br /> Item #4 : MAKE-UP AIR LOUVER- Provide a make up air louver in the Maintenance Building <br /> repair bay exterior wall as depicted on the revised Sheet M-3 , Revised Sheet A- 11 and per <br /> Detail 12/A- 11 . Revised Sheets M-3 and A- 11 are attached. <br /> Item #5 : NOTE FOR CLARIFICATION- A separate permit must be issued for the emergency <br /> generator fuel storage tank and fuel piping. General Contractor shall submit, to the <br /> Architect, Shop Drawings for review with tank details to meet NFPA requirements. General <br /> Contractor shall submit design and shop drawings to the Indian River County Building <br /> Department for review and permitting. General Contractor shall be responsible for the cost <br /> of plan review and permit. <br /> Item 46: IRRIGATION PUMP- Provide a 5 HP irrigation pump as depicted on the Electrical Plans. <br /> See Revised Sheets E-2, E-6 and E-7 attached. <br /> Item#7: LIFT STATION ELECTRICAL- The Lift Station pump load has been adjusted on the <br /> Electrical Plans. Refer to the Revised Sheets E-2 , E-6, and E-7 attached. <br /> - - - Item#8: CONTRACT DOCUMENTS -Add sheet 00200-5 "Instructions-to Bidders" (attached). - <br /> Item#9 : PRE-BIDDER' S MEETING — Pre-bidder ' s meeting has been changed to Building B, Room <br /> B1 - 501 . The date and time remain the same. <br /> Page 2 of 4 <br /> F:IEngineeringlCapital Projec1s1O70l 7RCPARKS COMPLEAlAddendumsVRC Parks Maintenance Complex Addendum #Ldoc <br />