My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORT PIERCE ENGINEERING, INC. IRC Maintenance <br /> rigid frame and clear plastic cover. Furnish an electronic copy of final comprehensive <br /> schedules for Project, in software and format selected by Owner. <br /> H. Cable Administration Drawings: Show building floor plans with cable administration point <br /> labeling. Identify labeling convention and show labels for telecommunications closets, terminal <br /> hardware and positions, horizontal cables, work areas and workstation terminal positions, <br /> grounding buses and pathways, and equipment grounding conductors. Follow convention of <br /> TIA/EIA-606. Furnish electronic record of all drawings, in software and format selected by <br /> Owner. <br /> 3.7 FIELD QUALITY CONTROL <br /> A. Perform the following field tests and inspections and prepare test reports: <br /> 1 . Operational Test: After installation of cables and connectors, demonstrate product <br /> capability and compliance with requirements. Test each signal path for end-to-end <br /> performance from each end of all pairs installed. Remove temporary connections when <br /> tests have been satisfactorily completed. <br /> 2. Copper Cable Procedures: Inspect for physical damage and test each conductor signal <br /> path for continuity and shorts. Use Class 2, bidirectional, Category 5 tester. Test for <br /> faulty connectors, splices, and terminations. Test according to TIA/EIA-TSB67, <br /> "Transmission Performance Specifications for Field Testing of Unshielded Twisted-Pair <br /> Cabling Systems." Link performance for UTP cables must meet minimum criteria of <br /> TMIA-568-A. <br /> B. Remove malfunctioning units, replace with new units, and retest as specified above. <br /> ENI? OF SECTION 16750 <br /> 16750 VOICE AND DATA COMMUNICATION CABLING Page 7 OF 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.