My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY PARKS <br /> MAINTENANCE COMPLEX <br /> PRE - BID MEETING <br /> WEDNESDAY , APRIL 29 , 2009 <br /> ATTENDEES : <br /> OWNER'S REP . <br /> Chris Kafer IRC Engineering <br /> David Hays IRC Engineering <br /> Jack Jolly IRC Engineering <br /> Jerry Davis IRC Purchasing Division <br /> David Fleetwood IRC Parks Division <br /> Dan Wittenberg IRC Engineering <br /> Dennise Cleerdin IRC Engineering <br /> Paul Dritenbas Edlund , Dritenbas , Binkley Architects & Associates <br /> G . Sean McGuire Carter Associates , Inc. <br /> Eric Svoboda Fort Pierce Engineering , Inc. <br /> Other — see attached list <br /> Addendum No. 2 will be issued by the County shortly after the pre-bid meeting . Questions from <br /> the pre-bid meeting and the answers will be documented in the Addendum No . 2 . <br /> All RFI 's should be addressed to Chris Kafer and he will decide which Consultant should answer <br /> the questions via the Addendum . Ultimately Chris needs to be kept in the loop . <br /> There were no site questions for Sean McGuire of Carter Associates . <br /> Paul Drittenbas went over major changes which will be detailed in Addendum No . 2 : <br /> 3 Buildings : Maintenance <br /> Storage <br /> Administration (unique hip trusses) <br /> Buildings are to be constructed from steel and masonry, with metal roofs . <br /> Covered walkway: Connects the maintenance building to the administration building . <br /> Over head doors: Changed from aluminum doors on plans to separate galvanized doors . <br /> Generator: Belly Tank /Day Tank and the location can be found on the Civil Plans . <br /> There weren 't any site lighting questions for Eric Svoboda of Fort Pierce Engineering . <br /> None of the buildings are threshold buildings , even though the Administration building has a <br /> room that holds 170 occupants . <br /> Air compressor size questions just came over the e-mail . There will be clarification on this in the <br /> Addendum No 2 . <br /> Only the main vents of the buildings are to be painted , not the girts . <br /> Vapor retarder (not vapor barrier) must be 10 or 15 mil . plastic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.