INDIAN RIVER COUNTY PARKS <br /> MAINTENANCE COMPLEX <br /> PRE - BID MEETING <br /> WEDNESDAY , APRIL 29 , 2009 <br /> ATTENDEES : <br /> OWNER'S REP . <br /> Chris Kafer IRC Engineering <br /> David Hays IRC Engineering <br /> Jack Jolly IRC Engineering <br /> Jerry Davis IRC Purchasing Division <br /> David Fleetwood IRC Parks Division <br /> Dan Wittenberg IRC Engineering <br /> Dennise Cleerdin IRC Engineering <br /> Paul Dritenbas Edlund , Dritenbas , Binkley Architects & Associates <br /> G . Sean McGuire Carter Associates , Inc. <br /> Eric Svoboda Fort Pierce Engineering , Inc. <br /> Other — see attached list <br /> Addendum No. 2 will be issued by the County shortly after the pre-bid meeting . Questions from <br /> the pre-bid meeting and the answers will be documented in the Addendum No . 2 . <br /> All RFI 's should be addressed to Chris Kafer and he will decide which Consultant should answer <br /> the questions via the Addendum . Ultimately Chris needs to be kept in the loop . <br /> There were no site questions for Sean McGuire of Carter Associates . <br /> Paul Drittenbas went over major changes which will be detailed in Addendum No . 2 : <br /> 3 Buildings : Maintenance <br /> Storage <br /> Administration (unique hip trusses) <br /> Buildings are to be constructed from steel and masonry, with metal roofs . <br /> Covered walkway: Connects the maintenance building to the administration building . <br /> Over head doors: Changed from aluminum doors on plans to separate galvanized doors . <br /> Generator: Belly Tank /Day Tank and the location can be found on the Civil Plans . <br /> There weren 't any site lighting questions for Eric Svoboda of Fort Pierce Engineering . <br /> None of the buildings are threshold buildings , even though the Administration building has a <br /> room that holds 170 occupants . <br /> Air compressor size questions just came over the e-mail . There will be clarification on this in the <br /> Addendum No 2 . <br /> Only the main vents of the buildings are to be painted , not the girts . <br /> Vapor retarder (not vapor barrier) must be 10 or 15 mil . plastic. <br />