My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:38:58 AM
Creation date
9/30/2015 11:40:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
07/14/2009
Control Number
2009-192A
Agenda Item Number
8.I
Entity Name
DeAngelis Diamond Construction
Subject
Appendix C - Technical Specifications
IRC Parks Maintenance Complex
Area
5500 77 Street
Project Number
0701
Bid Number
2009043
Archived Roll/Disk#
4034
Supplemental fields
SmeadsoftID
6816
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2028
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ A . M . ENGINEERING AND TESTING, INC . <br /> 590 N.W. MERCANTILE PLACE <br /> PORT ST. LuaE, FLORIDA 34986 <br /> (772) 924-3575 OFFICE - (772) 924-3580 FAX <br /> April 30, 2007 <br /> Indian River County Engineering Department <br /> Attn : Chris Kafer, P.E . <br /> 1840 25 `h Street <br /> Vero Beach, Florida 32960 <br /> Re : Geotechnical Exploration <br /> Proposed Indian River County Parks Maintenance Complex, IRC Project No. 0710 <br /> A. M. Engineering Project No. PSL1825- 1 <br /> Ladies and Gentlemen : <br /> A. M. Engineering and. Testing, Inc. is pleased to submit this geotechnical exploration report for <br /> E <br /> the referenced project . These services were performed in general accordance with our proposal <br /> dated March 8 , 2007 , and your authorization to proceed. After a brief executive summary, this <br /> letter presents our understanding of the project, a description of the explorations, a summary of <br /> the site and subsurface conditions, and our conclusions and recommendations for the foundations <br /> and pavements of the proposed construction . <br /> EXECUTIVE SUMMARY <br /> Portions of the southwest quadrant of the site were not accessible due to dense vegetation . <br /> Additional borings should be performed when the site has been cleared to verify the uniformity <br /> of the soil conditions in the previously unexplored area. <br /> Based on the available data from the borings the soils at the project site are generally suitable for <br /> supporting the proposed structures on conventional shallow foundations proportioned using a <br /> maximum bearing capacity of 2 ,500 psf. <br /> The project site requires standard site preparation including clearing, proof-rolling and surface <br /> compaction prior to constructing the foundation pads. As much as 2 feet of soils with significant <br /> amounts of organics will need to be stripped in some areas of the site. The foundation pads <br /> should consist of compacted lifts of suitable soil . The soil density should be tested before placing <br /> steel for the foundation. <br /> Additional details are provided in the body of the report. <br /> PROJECT DESCRIPTION <br /> The project site is an approximately 4 % acre tract in the southwestern quadrant of Section 33 , <br /> Township 31 S , Range 39E. The east end is bounded by the lateral ` G ' canal and the south end by 1 <br /> 77`h Street. <br /> 1 <br /> t <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.