Laserfiche WebLink
A. M. ENGINEERING AND TESTING, INC. <br /> Geotechnical Eoration <br /> Indian River County Parks Maintenance Complex, IRC rojectxplNo- 0710 <br /> A. M. Engineering Project No. PSL 1825- 1 <br /> The CPT soundings and the HCP readings in A13 - 11 indicated uniform soil conditions below the <br /> Proposed structures. A summary of the data from the CPT soundings is presented in Table 1 . <br /> TABLE 1 : SUMMARY OF CPT DATA <br /> M- t <br /> RLooseto <br /> ion <br /> 0 - 2to loose <br /> 2 - 4m <br /> 4 - 8to loose <br /> ium dense <br /> m <br /> FOUNDATION RECOMMENDATIONS <br /> The foundation recommendations presented in this section arecontingent on the proper <br /> ;. <br /> pr- of-the _site. a& contingent <br /> Preparation_Recommendations is <br /> section of this <br /> report, and on the maximum foundation loads stated in the Project Information section is <br /> this report. of <br /> After the project site has been prepared per the recommendation of this report, the proposed <br /> structures can be supported on conventional shallow spread footings or thickened edge <br /> monolithic slabs . The footings can be proportioned using a maximum net soil bearing pressure of <br /> 2 ,500 pounds per square foot (psf) . Although computed footing dimensions may be less, we <br /> recommend minimum widths of 16 inches for strip footings and 24 inches for square footings. Y <br /> The bottom of the footings should bear at least one foot below the adjacent exterior grade. <br /> After the footings have been excavated, a representative of A . M. Engineering and Testing, Inc. <br /> should evaluate the bottom of the footings with respect to the boring data and assess if a suitable <br /> bearing layer is present. Our representative should perform density tests to confirm that the <br /> density of the upper foot of soil in the bottom of the footings is at least 95 percent of the <br /> modified Proctor maximum dry density (ASTM D 1557). If the soil in the bottom of the footings € <br /> is loosened during excavation or`'if the footings are over-excavated and then backfilled to design <br /> grade, the footing subgrade should be compacted with a vibratory plate compactor until the <br /> required density is attained. <br /> t <br /> For the loads indicated in the Project Information section, we anticipate that the total settlement <br /> will be less than 1 inch, and the differential settlement between adjacent similarly loaded <br /> footings will be on the order of %: inch . Because of the granular nature of the subsurface soils , <br /> the majority of the settlement due to the dead loads should occur during construction ; post- <br /> construction settlement should be minimal . <br /> l <br /> 4 j <br /> } <br /> I <br /> a <br /> E <br />